Branch-Circuit Installation & Cable-Tray Pathways

Foundations · ELV
128Total hours
32Lecture
96Hands-on lab
ELV 1401Prerequisite
Credential
96 lab hours 32 lecture hours

This course develops hands-on branch-circuit installation skill in a critical-facility context, building on the Code foundation from National Electrical Code I. Students install conduit, cable-tray, and busway pathways typical of a data-hall electrical room, terminate branch-circuit conductors into panelboards and power distribution units, and verify installations against NEC Article 392 cable-tray fill and support-spacing requirements. Labs progress from bench-scale conduit runs to a simulated overhead busway and cable-tray pathway representative of a data-hall aisle. Students perform continuity, insulation-resistance, and polarity verification on completed circuits and document each step in a work-record system. The course emphasizes correct tool use, torque discipline, and lockout/tagout procedure on every energized-adjacent task. It prepares students for the branch-circuit and pathway installation portion of an apprentice electrician's work process schedule and for BMS and controls wiring coursework that follows.

What you'll be able to do

  1. Install rigid and EMT conduit runs meeting NEC Article 342/358 support-spacing requirements.
  2. Install cable tray sections and calculate cable fill against NEC Article 392 tables.
  3. Terminate branch-circuit conductors into a panelboard and a power distribution unit to specified torque values. Safety-critical
  4. Lock out and verify de-energization of a branch circuit before beginning termination or repair work. Safety-critical
  5. Install an overhead busway section and torque bus-plug connections to manufacturer specification. Safety-critical
  6. Verify a completed branch circuit using continuity, insulation-resistance, and polarity tests. Safety-critical
  7. Select and size a raceway pathway for a mixed power and low-voltage cable run while maintaining required separation.
  8. Troubleshoot an intentionally miswired branch circuit and document the fault-finding process. Safety-critical
  9. Document a completed pathway and circuit installation in the SAVERN Assets work-record system with photo evidence and as-built notes.
  10. Calculate voltage drop for a branch-circuit run and select a conductor size to keep drop within a stated design limit.
  11. Bond a metallic cable tray section to the equipment grounding system and verify continuity end to end. Safety-critical

Train the team that runs the factory.

The Institute travels with every SAVRN campus.

Engage SAVRN → Open the catalog