68 measures across 39 states
- Arizona · FY2027 budget — Three-year pause on data center sales-tax exemption (In force, 2026-07) azcapitoltimes.com →
- Florida · HB 7031 — Data-center sales-tax exemption rollback (In force, 2025-06) flsenate.gov →
- Florida · SB 484 — Data center ratepayer, water and local-authority law (In force, 2026-06) flgov.com →
- Indiana · HEA 1210 — Local payment in lieu of taxes from data centers (In force, 2026-03) ipm.org →
- Iowa · HF 976 — Limits data-center sales/use tax exemptions (In force, 2025-06) nyemaster.com →
- Kentucky · Executive Order 2026-494 — Data-center screening and permit-denial order (In force, 2026-08) lpm.org →
- Louisiana · Executive Order 26-058 — Ratepayer and Community Protection Initiative (In force, 2026-06) lailluminator.com →
- Maine · LD 713 — Data centers excluded from state tax incentive programs (In force, 2026-04) mainesenate.org →
- Minnesota · HF 16 (2025 1st Special Session) — Data center energy, environmental and tax law (In force, 2025-06) house.mn.gov →
- Nebraska · Executive Order 26-17 — Ends ImagiNE Act tax incentives for new data centers (In force, 2026-07) governor.nebraska.gov →
- New Jersey · Data Center Fair Share Act — Data center ratepayer class and cost obligations (In force, 2026-07) nj.gov →
- Oklahoma · HB 2992 — Data Center Customer Ratepayer Protection Act of 2026 (In force, 2026-05) okhouse.gov →
- Oregon · HB 3546 (POWER Act) — Protecting Oregonians With Energy Responsibility Act (In force, 2025-06) olis.oregonlegislature.gov →
- Pennsylvania · Executive Order 2026-05 — GRID Requirements for data center permitting (In force, 2026-08) pa.gov →
- South Dakota · SB 135 — Data Center Bill of Rights for Citizens (In force, 2026-03) sdpb.org →
- Tennessee · HB 1847 / SB 2128 — Data Center Cost Responsibility Act (In force, 2026-05) wkrn.com →
- Texas · SB 6 — Large-load interconnection standards and grid curtailment (In force, 2025-06) utilitydive.com →
- Utah · Executive Order 2026-03 — A higher bar for data-center development (In force, 2026-05) governor.utah.gov →
- Virginia · HB 30 (2026 budget) — Data center electricity consumption tax (In force, 2026-06) gtlaw.com →
- Washington · ESSB 6231 — Rolling back data-center tax exemptions (In force, 2026-04) app.leg.wa.gov →
- Illinois · Executive directive — Pause on new data center tax incentives (Paused, 2026-07) dmnews.com →
- New York · Executive Order 62 — Statewide hyperscale data center moratorium (executive) (Paused, 2026-07) governor.ny.gov →
- Ohio · Executive directive — Pause on new data center sales-tax exemptions (Paused, 2026-05) thehill.com →
- Texas · Executive directive (Gov. Abbott) — Freeze on new data center grid connections pending audit (Paused, 2026-08) texastribune.org →
- Alabama · SB 270 — PSC review of large-load data center contracts (Proposed, 2026) afslaw.com →
- Arizona · HB 2756 — Rules for extra high load factor customers (Proposed, 2026) afslaw.com →
- California · SB 887 — CEQA treatment of data centers (Proposed, 2026-05) leginfo.legislature.ca.gov →
- California · SB 886 — Data center tariff and ratepayer protection (Proposed, 2026-01) sd18.senate.ca.gov →
- Delaware · HB 233 (Substitute 1) — Large energy-use facilities bear their own infrastructure costs (Proposed, 2026-06) housedems.delaware.gov →
- Delaware · HB 445 — 100% new energy requirement for large energy-use facilities (Proposed, 2026-06) housedems.delaware.gov →
- Georgia · SB 476 — Elimination of state tax credits reaching data centers (Proposed, 2026-02) afslaw.com →
- Illinois · SB 4016 / HB 5513 — Hyperscale self-generation and water transparency (Proposed, 2026-02) afslaw.com →
- Maryland · SB 596 — Demand response and storage for large-load customers (Proposed, 2026) afslaw.com →
- Michigan · HB 5594-5596 / SB 1018-1020 — Moratorium on new data center approvals (Proposed, 2026-06) legislature.mi.gov →
- Minnesota · HF 5125 / SF 3265 — Repeal data center sales-and-use tax exemption (Proposed, 2026-05) revisor.mn.gov →
- New Mexico · Announced bill (2027 session) — Proposed statewide data center moratorium (Proposed, 2026-08) sourcenm.com →
- New York · S10642 / A11560 — Responsible Data Center Development Act (one-year moratorium) (Proposed, 2026-06) nysenate.gov →
- New York · A 10141 / S 9144 — Three-year halt on data center construction (Proposed, 2025) afslaw.com →
- North Carolina · H 1189 — Datacenter Transparency Act — statewide siting moratorium (Proposed, 2026-04) lrs.sog.unc.edu →
- North Carolina · SB 730 — Ratepayer Protection Act — sound and water standards (Proposed, 2026-06) ncnewsline.com →
- North Carolina · H 1063 — Ratepayer and Resource Protection Act (Proposed, 2026-04) ncleg.gov →
- Ohio · SB 374 — End data center sales-tax exemption (Proposed, 2026) ohiosenate.gov →
- Oklahoma · HB 4424 — Sunset of data center tax incentives (Proposed, 2026) afslaw.com →
- Pennsylvania · SB 1345 — Optional municipal moratorium on high impact data centers (Proposed, 2026-07) palegis.us →
- Pennsylvania · SB 1359 — Statewide three-year hyperscale data center moratorium (Proposed, 2026-06) palegis.us →
- Pennsylvania · HB 2496 — Municipal authority to pause data center proposals (Proposed, 2026-06) palegis.us →
- South Carolina · HJR 5526 — Data Center Moratorium (joint resolution) (Proposed, 2026-04) scstatehouse.gov →
- South Carolina · S 867 — Data Center Development Act (Proposed, 2026-04) scstatehouse.gov →
- South Carolina · S 902 — Data center siting permits through the PSC (Proposed, 2026) scstatehouse.gov →
- Virginia · HB 1515 — Temporary moratorium on local data center approvals (Proposed, 2026-02) lis.virginia.gov →
- Virginia · HB 153 — High Energy Use Facility siting permit (Proposed, 2026-01) virginiamercury.com →
- Washington · HB 2515 — Clean energy procurement and cost obligations (Proposed, 2026) afslaw.com →
- Colorado · SB 26-102 — Large-load data-center conditions (Failed / vetoed, 2026-05) leg.colorado.gov →
- Connecticut · SB 245 — Repeal of data center tax incentives (Failed / vetoed, 2026-05) ctmirror.org →
- Georgia · HB 1012 — One-year data center construction moratorium (Failed / vetoed, 2026-04) wabe.org →
- Georgia · SB 410 — Phase-out of data center tax breaks (Failed / vetoed, 2026-04) georgiawatch.org →
- Indiana · HB 1333 — Conditions and limits on data center tax exemptions (Failed / vetoed, 2026-02) yahoo.com →
- Kansas · SB 531 — Ban on new large data centers in drought counties (Failed / vetoed, 2026-07) servercountry.org →
- Maine · LD 307 — Maine Data Center Coordination Council; temporary limitation on data centers (Failed / vetoed, 2026-04) maine.gov →
- Maryland · HB 120 — Moratorium on construction of new data centers (Failed / vetoed, 2026) mgaleg.maryland.gov →
- Massachusetts · Senate amendment — Proposed one-year data-center moratorium (Failed / vetoed, 2026-07) commonwealthbeacon.org →
- New Hampshire · HB 1265 — One-year data center construction moratorium (Failed / vetoed, 2026-03) legiscan.com →
- Oklahoma · SB 1488 — Moratorium on new data centers until Nov 1 2029 (Failed / vetoed, 2026-05) legiscan.com →
- Rhode Island · S2776 — Data-center grid-cost and water guardrails (Failed / vetoed, 2026-06) webserver.rilegislature.gov →
- South Carolina · H 5286 — Data Center Moratorium (Failed / vetoed, 2026-02) scstatehouse.gov →
- South Dakota · SB 232 — One-year hyperscale data center moratorium (Failed / vetoed, 2026-02) legiscan.com →
- Vermont · S.205 / H.727 — Moratorium on new data centers until 2030 (Failed / vetoed, 2026-05) legislature.vermont.gov →
- Wisconsin · AB 1099 / SB 1061 — Moratorium on operation of data centers (Failed / vetoed, 2026-03) docs.legis.wisconsin.gov →
Local & county measures
280 measures across 43 states
Alabama (8)
- Birmingham — Six-month pause on large data center applications (In force, 2026-03) birminghamwatch.org →
- Chelsea — One-year moratorium on data center licenses and permits (In force, 2026-07) 280living.com →
- Cullman — One-year data center moratorium (In force, 2026-06) yellowhammernews.com →
- Fort Payne — Six-month data center moratorium (In force, 2026-06) 256today.com →
- Homewood — Twelve-month moratorium on new data center applications (In force, 2026-06) wbrc.com →
- Leeds — One-year moratorium on data center development (In force, 2026-06) wbrc.com →
- Springville — Moratorium on data centers (In force, 2026-07) newsaegis.com →
- Westover — Six-month moratorium on data centers (In force, 2026-08) wbrc.com →
Arizona (3)
- Chandler — Rejection of proposed AI data center (In force, 2025-12) deseret.com →
- Pima County — Proposed 120-day data center moratorium (Proposed, 2026-08) azluminaria.org →
- Tucson — Rejection of Project Blue data center annexation (In force, 2025-08) azluminaria.org →
Arkansas (6)
- Carroll County — 12-month data center moratorium (In force, 2026-06) ky3.com →
- Independence County — Five-year data center moratorium (In force, 2026-08) whiterivernow.com →
- Little Rock — Data center moratorium (failed) (Failed / vetoed, 2026-06) ualrpublicradio.org →
- Pulaski County — Data center moratorium (failed) (Failed / vetoed, 2026-08) ualrpublicradio.org →
- Russellville — Six-month data center moratorium (In force, 2026-07) arkansasadvocate.com →
- Union County — One-year data center moratorium (In force, 2026-06) ualrpublicradio.org →
California (8)
- Calipatria — Permanent data center ban (in development) (Proposed, 2026-07) kpbs.org →
- Coachella — Data center moratorium moving toward permanent ban (In force, 2026-06) kesq.com →
- Imperial — Emergency data center moratorium (In force, 2026-06) kpbs.org →
- Imperial County — Data center moratorium (extended to May 2027) (In force, 2026-06) inewsource.org →
- Indio — Urgency data center moratorium (In force, 2026-06) indio.org →
- Monterey Park — Measure NDC permanent data center ban (In force, 2026-06) montereypark.ca.gov →
- Palm Springs — Proposed temporary data center moratorium (Proposed, 2026-08) kesq.com →
- Tulare County — 45-day data center moratorium (In force, 2026-08) thesungazette.com →
Colorado (6)
- Boulder County — Six-month data center moratorium (In force, 2026-06) kunc.org →
- Broomfield — 18-month data center moratorium (Ordinance 2313) (In force, 2026-07) coloradopolitics.com →
- Denver — One-year data center moratorium (In force, 2026-05) 9news.com →
- Larimer County — Temporary data center facilities moratorium (In force, 2026-01) larimer.gov →
- Monument — Six-month data center pause (In force, 2026) kunc.org →
- Woodland Park — 18-month data center pause (In force, 2026-07) kunc.org →
Connecticut (1)
- Groton — Permanent zoning cap replacing 2022 moratorium (In force, 2023) datacenterdynamics.com →
Delaware (2)
- Dover — Proposed 18-month pause on data center reviews (Proposed, 2026-08) spotlightdelaware.org →
- Harrington — Rejection of ordinance allowing data centers (In force, 2026-08) wboc.com →
Florida (10)
- Citrus County — One-year data center moratorium (In force, 2026-05) wfla.com →
- Clay County — One-year data center moratorium (In force, 2026-06) firstcoastnews.com →
- Hernando County — One-year data center moratorium (In force, 2026-06) wtsp.com →
- Nassau County — Up to 12-month data center moratorium (In force, 2026) nassaucountyfl.com →
- Palm Beach County — One-year data center moratorium (recommended) (Proposed, 2026-08) cbs12.com →
- Pasco County — One-year data center moratorium (In force, 2026-06) wusf.org →
- Santa Rosa County — 12-month data center moratorium (in development) (Proposed, 2026-06) wuwf.org →
- Sarasota County — 12-month hyperscale data center moratorium (In force, 2026-07) businessobserverfl.com →
- Washington County — One-year moratorium on data center applications (In force, 2026-08) washingtoncounty.news →
- Zephyrhills — One-year data center moratorium (In force, 2026-06) wusf.org →
Georgia (11)
- Carroll County — 100-day data center and BESS moratorium (unincorporated areas) (In force, 2026-03) times-georgian.com →
- Cherokee County — Data center moratorium extended by 180 days (In force, 2026-08) wsbtv.com →
- Cobb County — 180-day data center moratorium (unincorporated areas) (In force, 2026-02) fox5atlanta.com →
- Coweta County — 180-day data center moratorium (Failed / vetoed, 2025-05) atlantanewsfirst.com →
- DeKalb County — Data center moratorium (extended to June 2026) (In force, 2025-07) ajc.com →
- Dougherty County — 45-day data center moratorium (In force, 2026-07) walb.com →
- Douglas County — 90-day data center moratorium (In force, 2026-03) fox5atlanta.com →
- Fayetteville — 90-day moratorium, later permanent ban (In force, 2026-01) fayette-news.net →
- Hall County — 180-day moratorium (data centers, high-density residential, detention centers) (In force, 2026-02) accessnorthga.com →
- Marietta — Six-month data center moratorium (In force, 2026-07) fox5atlanta.com →
- Newton County — Data center moratorium (extended 180 days) (In force, 2026-02) covnews.com →
Illinois (7)
- Champaign County — 12-month data center moratorium (In force, 2026-04) nprillinois.org →
- City of Bloomington — Six-month data center moratorium (In force, 2026-05) wglt.org →
- City of Carbondale — One-year data center moratorium (In force, 2026-06) kfvs12.com →
- City of Effingham — 12-month data center and crypto moratorium (In force, 2026) thexradio.com →
- City of West Chicago — 180-day moratorium (Ordinance 26-O-0011) (In force, 2026-07) westchicago.org →
- Town of Normal — Six-month data center moratorium (In force, 2026-05) 25newsnow.com →
- Village of Godfrey — Data center application moratorium (In force, 2026) riverbender.com →
Indiana (6)
- Boone County — One-year data center moratorium (Ordinance 2026-08) (In force, 2026-06) boonecounty.in.gov →
- Elkhart — Proposed data center and battery storage moratorium (Proposed, 2026-08) wsbt.com →
- Indianapolis (Marion County) — Data center moratorium through 2027 (In force, 2026-08) wfyi.org →
- Jeffersonville — One-year data center moratorium (In force, 2026-08) newsandtribune.com →
- New Albany (Floyd County) — One-year data center moratorium (In force, 2026-07) newsandtribune.com →
- Starke County — 12-month hyperscale data center moratorium (Ordinance 2025-37) (In force, 2026-01) starke.in.gov →
Iowa (8)
- City of Peosta — Six-month data center moratorium (In force, 2026-06) kwwl.com →
- Dubuque County — 12-month data center moratorium (In force, 2026-05) kcrg.com →
- Johnson County — One-year data center moratorium (unincorporated) (In force, 2025-11) cbs2iowa.com →
- Linn County — 18-month rezoning moratorium (EU-3 data center district) (In force, 2026-07) linncountyiowa.gov →
- Madison County — One-year data-processing-facility moratorium (In force, 2026-06) news.yahoo.com →
- Plymouth County — One-year revocable data center moratorium (In force, 2026-06) klem1410.com →
- Sioux County — One-year data center and BESS moratorium (In force, 2026-06) ktiv.com →
- Woodbury County — 12-month data center moratorium (Resolution 14064) (In force, 2026-06) woodburycountyiowa.gov →
Kansas (3)
- Riley County — Temporary data center moratorium (In force, 2026-05) themercury.com →
- Saline County — Three-year moratorium on data centers and energy facilities (In force, 2026-03) salina311.com →
- Sedgwick County — Interim data center development moratorium (In force, 2026-01) kwch.com →
Kentucky (14)
- Bell County — Two-year data center moratorium (In force, 2026-07) wymt.com →
- Boyle County — One-year data center moratorium (In force, 2026-06) boylecountyky.gov →
- Breckinridge County — One-year data center moratorium (In force, 2025-11) wkyufm.org →
- Bullitt County — One-year data center moratorium (In force, 2026-07) spectrumnews1.com →
- Cave City — One-year data center moratorium (In force, 2026-06) datacenterdynamics.com →
- Daviess County — 12-month data center moratorium (In force, 2026-05) 14news.com →
- Edmonson County — One-year moratorium (Ordinance EC26-18) (In force, 2026-06) wnky.com →
- Lexington-Fayette Urban County — Moratorium on data center development (In force, 2026-06) lex18.com →
- Louisville-Jefferson County Metro — Six-month moratorium on new data centers (In force, 2026-08) lpm.org →
- Meade County — Temporary moratorium (Ordinance 2025-07) (In force, 2026-01) meadeky.gov →
- Nelson County — One-year data center moratorium (In force, 2026-07) spectrumnews1.com →
- Nicholasville — Six-month data center moratorium (In force, 2026-08) wkyt.com →
- Oldham County — 150-day data center moratorium (In force, 2026) datacenterdynamics.com →
- Versailles — Data center moratorium through end of 2026 (In force, 2026-06) lex18.com →
Louisiana (2)
- Caddo Parish — Proposed two-year moratorium on data-center tax incentives (Proposed, 2026-08) ksla.com →
- New Orleans — One-year data center moratorium (In force, 2026-01) wwno.org →
Maine (1)
- Bangor — 180-day data center moratorium (In force, 2026-04) bangordailynews.com →
Maryland (5)
- Calvert County — Six-month data center moratorium (In force, 2026-08) calvertcountymd.gov →
- Frederick County — Data center permitting pause through end of 2026 (In force, 2026-07) southernmarylandchronicle.com →
- Montgomery County — 18-month data center moratorium (In force, 2026-06) southernmarylandchronicle.com →
- Prince George's County — Two-year hyperscale data center moratorium (In force, 2026-07) marylandmatters.org →
- Washington County — 12-month data center moratorium (In force, 2026-06) thedailyrecord.com →
Massachusetts (1)
- Lowell — 360-day data center moratorium (In force, 2026-03) lowellma.gov →
Michigan (34)
- Armada Township — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Big Rapids Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- Clark Township — Local moratorium on data center approvals (In force, 2025-06) wkar.org →
- Dundee Township — Local moratorium on data center approvals (In force, 2025-10) wkar.org →
- Eagle Township (Clinton County) — One-year data center moratorium and interim zoning ordinance (In force, 2026-02) baldorilaw.com →
- Flint — 12-month data center moratorium (In force, 2026-06) abc12.com →
- Grand Blanc Township — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Green Charter Township — Local moratorium on data center approvals (In force, 2025-12) wkar.org →
- Hayes Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- Howell Township — Local moratorium on data center approvals (In force, 2025-11) wkar.org →
- Kalamazoo — One-year data center moratorium (In force, 2026-08) fox17online.com →
- Lansing — 182-day data center moratorium (In force, 2026-07) wilx.com →
- Lenox Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- Lodi Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- Manchester Township — Local moratorium on data center approvals (In force, 2025-10) wkar.org →
- Mason — Data center moratorium lifted after zoning adopted (Failed / vetoed, 2026-02) wkar.org →
- Meridian Township — Six-month data center and battery storage moratorium (In force, 2026-05) wkar.org →
- Northville — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Orion Township — Six-month data center moratorium (In force, 2026-06) lakeorionreview.com →
- Pittsfield Township — Local moratorium on data center approvals (In force, 2025-11) wkar.org →
- Pontiac — Six-month data center moratorium (In force, 2026-01) detroitnews.com →
- Saginaw — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Saline — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Solon Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- South Lyon — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- Springfield Township — 180-day data center moratorium (In force, 2026-01) detroitnews.com →
- Sterling Heights — One-year data center moratorium (In force, 2026-02) eu.detroitnews.com →
- Sylvan Township — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Taylor — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Tyrone Township — Local moratorium on data center approvals (In force, 2025-12) wkar.org →
- Village of Romeo — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
- Waterford Township — Temporary data center moratorium (Ord. 2026-Z-003) (In force, 2026) waterfordmi.gov →
- York Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
- Ypsilanti Township — 180-day moratorium on major electric utility infrastructure (In force, 2026-08) wemu.org →
Minnesota (2)
- Minneapolis — Six-month large data center moratorium (In force, 2026-05) mprnews.org →
- North Mankato — Proposed data center moratorium (Proposed, 2026-08) mankatofreepress.com →
Mississippi (1)
- City of Jackson — 183-day data center moratorium (In force, 2026-07) mississippitoday.org →
Missouri (9)
- City of Camdenton — One-year data center moratorium (In force, 2026-05) krcgtv.com →
- City of Neosho — One-year data center moratorium (In force, 2026) joplinglobe.com →
- City of Peculiar — Data centers removed from zoning ordinance (In force, 2026-05) kshb.com →
- City of St. Charles — Zoning change banning data centers (In force, 2026-05) stlpr.org →
- City of St. Peters — One-year data center moratorium (In force, 2026-05) midriversnewsmagazine.com →
- Jackson County — 180-day data center moratorium (In force, 2026-06) kctv5.com →
- Nodaway County — Six-month data center moratorium (Proposed, 2026-07) maryvilleforum.com →
- St. Charles County — Six-month data center moratorium (In force, 2026-07) stlpr.org →
- Webster County — Six-month moratorium (data centers and energy facilities) (In force, 2026) sbj.net →
Montana (1)
- Missoula County — One-year interim-zoning data center moratorium (In force, 2026-07) montanafreepress.org →
Nebraska (4)
- Cherry County — Six-month conditional-use-permit moratorium (In force, 2026) metro.newschannelnebraska.com →
- Logan County — 12-month data center moratorium (In force, 2026-07) nebraskapublicmedia.org →
- Otoe County — One-year data center moratorium (In force, 2026-05) journalstar.com →
- Seward County — One-year data center moratorium (In force, 2026-06) ksnblocal4.com →
Nevada (2)
- Nye County — Ban on data centers in Pahrump Valley / Basin 162 (In force, 2026-08) nevadacurrent.com →
- Reno — Extended data center moratorium (In force, 2026-06) nevadacurrent.com →
New Jersey (38)
- Andover — Municipal ban on data centers (In force, 2026) patch.com →
- Asbury Park — Municipal ban on data centers (In force, 2026) patch.com →
- Bayonne — Citywide ban on data centers (In force, 2026-08) hudsoncountyview.com →
- Berkeley Heights — Municipal ban on data centers (In force, 2026) patch.com →
- Bernards — Municipal ban on data centers (In force, 2026) patch.com →
- Burlington — Municipal ban on data centers (In force, 2026) patch.com →
- Cherry Hill — Municipal ban on data centers (In force, 2026) patch.com →
- Cinnaminson — Proposed municipal ban on data centers (Proposed, 2026) patch.com →
- Deerfield — Municipal ban on data centers (In force, 2026) patch.com →
- Delanco — Municipal ban on data centers (In force, 2026) patch.com →
- East Greenwich — Municipal ban on data centers (In force, 2026) patch.com →
- Edgewater Park — Municipal ban on data centers (In force, 2026) patch.com →
- Galloway Township — Proposed six-month data center moratorium (Proposed, 2026) gtnj.org →
- Harrison — Municipal ban on data centers (In force, 2026) patch.com →
- Holland — Municipal ban on data centers (In force, 2026) patch.com →
- Holmdel — Municipal ban on data centers (In force, 2026) patch.com →
- Howell — Municipal ban on data centers (In force, 2026-08) patch.com →
- Jackson — Proposed municipal ban on data centers (Proposed, 2026) patch.com →
- Jersey City — Municipal ban on data centers (In force, 2026-08) patch.com →
- Logan Township — Municipal ban on data centers (In force, 2026) patch.com →
- Mansfield — Municipal ban on data centers (In force, 2026) patch.com →
- Medford — Municipal ban on data centers (In force, 2026) patch.com →
- Millville — Municipal ban on data centers (In force, 2026) patch.com →
- Monroe — Municipal ban on data centers (In force, 2026) patch.com →
- Montgomery — Municipal ban on data centers (In force, 2026) patch.com →
- Neptune — Municipal ban on data centers (In force, 2026) patch.com →
- North Brunswick — Proposed municipal ban on data centers (Proposed, 2026) patch.com →
- Pemberton — Municipal ban on data centers (In force, 2026) patch.com →
- Red Bank — Municipal ban on data centers (In force, 2026) patch.com →
- Sayreville — 18-month data center moratorium (In force, 2026-06) magic983.com →
- South Brunswick — Proposed municipal ban on data centers (Proposed, 2026) patch.com →
- Sparta — Municipal ban on data centers (In force, 2026) patch.com →
- Summit — Municipal ban on data centers (In force, 2026) patch.com →
- Union — Municipal ban on data centers (In force, 2026) patch.com →
- Vernon — Municipal ban on data centers (In force, 2026) patch.com →
- Warren — Municipal ban on data centers (In force, 2026) patch.com →
- Waterford — Municipal ban on data centers (In force, 2026) patch.com →
- Winslow — Municipal ban on data centers (In force, 2026) patch.com →
New Mexico (3)
- Santa Fe County — 18-month data center moratorium (In force, 2026-06) santafecountynm.gov →
- Sierra County — 18-month data center moratorium (In force, 2026) dchieftain.com →
- Socorro County — One-year data center moratorium (In force, 2026-06) sourcenm.com →
New York (11)
- Town of Brookhaven — 18-month data center moratorium (In force, 2026-07) tbrnewsmedia.com →
- Town of East Fishkill — Three-year data center moratorium (In force, 2026-06) spectrumlocalnews.com →
- Town of East Greenbush — Six-month moratorium on data center land use approvals (In force, 2026-07) cbs6albany.com →
- Town of Lysander — Six-month data center moratorium (In force, 2026-05) townoflysander.org →
- Town of Manlius — 12-month data center and crypto moratorium (In force, 2026-07) townofmanlius.gov →
- Town of Mohawk — Six-month moratorium on data center permitting (In force, 2026-08) dailygazette.com →
- Town of Oneonta — One-year data center and crypto moratorium (In force, 2026-05) wbng.com →
- Town of Perth — One-year data center moratorium (In force, 2025-06) dailygazette.com →
- Town of Salina — One-year data center moratorium (In force, 2026) wrvo.org →
- Town of Tonawanda — One-year moratorium on data centers of 20 MW or more (In force, 2026-08) btpm.org →
- Town of Van Buren — One-year data center moratorium (In force, 2026) wrvo.org →
North Carolina (15)
- Alamance County — One-year data center moratorium (In force, 2026-08) elonnewsnetwork.com →
- Charlotte — 150-day data center moratorium (In force, 2026-06) wbtv.com →
- Chatham County — 12-month data center and crypto-mining moratorium (In force, 2026-02) wral.com →
- City of Durham — Data center moratorium (60-day, extended to 12 months) (In force, 2026-05) wral.com →
- City of Wilson — One-year data center moratorium (In force, 2026-05) wilsontimes.com →
- Cumberland County — 6-month data center moratorium (unincorporated areas) (In force, 2026-06) cityviewnc.com →
- Davie County — One-year data center moratorium (In force, 2026-07) wfdd.org →
- Greensboro — 120-day moratorium for data centers above 10 MW (In force, 2026-08) abc45.com →
- Orange County — One-year data center moratorium (In force, 2026-04) orangecountync.gov →
- Surry County — Two-year data center moratorium (In force, 2026-07) wfae.org →
- Town of Boone — One-year data center and crypto-mining moratorium (In force, 2026-03) wfae.org →
- Town of Hillsborough — 60-day data center moratorium (later extended) (In force, 2026-06) chapelboro.com →
- Town of Waxhaw — 12-month data center moratorium (In force, 2026-08) wbtv.com →
- Watauga County — County data center moratorium (In force, 2026) wunc.org →
- Yadkin County — Proposed one-year data center moratorium (Proposed, 2026-08) wunc.org →
North Dakota (2)
- Barnes County — Six-month data center moratorium (In force, 2026-05) newsdakota.com →
- Mercer County — One-year data center moratorium (lifted) (Failed / vetoed, 2026-03) centralnordak.com →
Ohio (12)
- Alliance — 18-month data center moratorium (In force, 2026-07) aol.com →
- Blanchester — Data center moratorium (In force, 2026-02) wnewsj.com →
- Butler County — Six-month data center moratorium (In force, 2026-06) wvxu.org →
- Cincinnati — Temporary data center construction restrictions (In force, 2026-02) wcpo.com →
- Cleveland — Three-month pause on standalone data centers (In force, 2026-07) clevelandohio.gov →
- Conneaut — One-year data center moratorium (failed) (Failed / vetoed, 2026-08) starbeacon.com →
- Grove City — 12-month data center moratorium (In force, 2026-06) nbc4i.com →
- Kent — Temporary AI data center permit moratorium (Ord. 2026-31) (In force, 2026) kentohio.gov →
- Lordstown — 180-day data center moratorium (extended) (In force, 2026-01) tribtoday.com →
- Massillon — Data center moratorium (reduced to 60 days) (In force, 2026-04) aol.com →
- Norton — 180-day data center moratorium (In force, 2025-11) akron.com →
- Ravenna — One-year data center moratorium (In force, 2026-04) theportager.com →
Oklahoma (3)
- Cherokee Nation (tribal and trust lands) — Ban on hyperscale data centers (In force, 2026-08) kgou.org →
- Edmond — Data center permit moratorium (through Dec. 31, 2026) (In force, 2026-06) kfor.com →
- Oklahoma City — Data center moratorium through end of 2026 (In force, 2026) okc.gov →
Oregon (1)
- City of Hillsboro — 120-day data center land-use moratorium (In force, 2026-07) opb.org →
Pennsylvania (3)
- Bensalem Township — 180-day data center curative-amendment moratorium (In force, 2026-06) suburbanrealtorsalliance.com →
- Gregg Township (Union County) — 180-day moratorium on data center applications (In force, 2026-08) northcentralpa.com →
- Hazle Township — 180-day curative-amendment data center pause (In force, 2026-06) fox56.com →
Rhode Island (2)
- Charlestown — Zoning ban on data centers and battery storage (In force, 2026-08) progressive-charlestown.com →
- Smithfield — Zoning ban on data centers in all districts (In force, 2026-05) oceanstatemedia.org →
South Carolina (4)
- Anderson County — Six-month data center moratorium (In force, 2026-08) foxcarolina.com →
- Chester County — Six-month data center moratorium (In force, 2026-07) wbtv.com →
- Spartanburg County — Proposed 12-month data center moratorium (Proposed, 2026-08) postandcourier.com →
- York County — Nine-month data center moratorium (In force, 2026-07) wsoctv.com →
South Dakota (1)
- Yankton County — Six-month data center and crypto moratorium (In force, 2026-07) ktiv.com →
Tennessee (8)
- Anderson County — Two-year data center moratorium (In force, 2026-06) wvlt.tv →
- Coffee County — One-year data center moratorium (In force, 2026-06) newschannel5.com →
- Johnson City — Data center moratorium extended to Dec. 3, 2026 (In force, 2026-05) supertalk929.com →
- Knox County — One-year data center moratorium (through June 30, 2027) (In force, 2026-07) wate.com →
- Knoxville — One-year moratorium on large data centers (10 MW+) (In force, 2026-07) knoxvilletn.gov →
- Memphis — Proposed 12-month data center pause (Proposed, 2026-08) actionnews5.com →
- Nashville-Davidson County — Data center permit moratorium plus zoning regulations (In force, 2026-07) wsmv.com →
- Washington County — One-year data center moratorium (through June 30, 2027) (In force, 2026-03) wjhl.com →
Texas (3)
- Fort Worth — Proposed 90-day data center moratorium (Proposed, 2026-08) keranews.org →
- Hill County — One-year data center moratorium (rescinded) (Failed / vetoed, 2026-06) texastribune.org →
- San Marcos — Zoning ban on data centers (In force, 2026-06) texastribune.org →
Utah (2)
- Box Elder County — 180-day data center moratorium (In force, 2026-06) sltrib.com →
- Cache County — 180-day data center moratorium (In force, 2026-06) hjnews.com →
Virginia (3)
- City of Chesapeake — Eight-month data center application pause (In force, 2026-07) virginiabusiness.com →
- Hanover County — Rejection of Mountain Road Technology Park data center (In force, 2026-05) virginiabusiness.com →
- Prince William County — Rejection of Dulles Cloud South data center rezoning (In force, 2026-07) virginiamercury.com →
Washington (5)
- Seattle — Emergency one-year data center moratorium (Council Bill 121214) (In force, 2026-06) council.seattle.gov →
- Skagit County — Six-month data center moratorium (In force, 2026-06) chronline.com →
- Snohomish County — Emergency six-month data center moratorium (In force, 2026-06) heraldnet.com →
- Spokane — One-year data center permit moratorium (In force, 2026-06) my.spokanecity.org →
- Spokane County — Four-month data center moratorium (In force, 2026-08) rangemedia.co →
Wisconsin (9)
- Brown County — County data center moratorium (declined) (Failed / vetoed, 2026-06) dailyreporter.com →
- City of Madison — 12-month data center moratorium (10,000 sq ft+) (In force, 2026-01) cityofmadison.com →
- City of Superior — One-year data center moratorium (In force, 2026-06) wpr.org →
- Manitowoc County — 18-month data center moratorium (In force, 2026-04) wpr.org →
- Port Washington — Referendum requiring a public vote on large tax incentives (In force, 2026-04) wpr.org →
- Village of Bellevue — 12-month data center moratorium (In force, 2026-08) nbc26.com →
- Village of Cottage Grove — 12-month data center moratorium (In force, 2026-07) wmtv15news.com →
- Village of Greenville (Outagamie County) — One-year data center moratorium (10,000 sq ft+) (In force, 2026-07) wearegreenbay.com →
- Village of Wrightstown — One-year data center moratorium (In force, 2026-07) wearegreenbay.com →