Savrn Command/Trust Center

Trust Center.

Platform-level commitments and evidence across the SAVRN AI Factory. Drill into a deployment's Trust Center from its project page for site-specific data.

Certifications In progress

Third-party certifications and accreditations claimed by Savrn and its hardware suppliers.

  • IMDC hardware: UL listing in progress (manufacturer driven, est. Q3 2026).
  • Octopod cooling pod: pre-certification testing complete; ETL filing prepared.
  • Savrn platform: SOC 2 Type I scoping kicked off May 2026.

Quality release Available

How a unit moves from manufacturing to customer-ready, including the 4-agent release gate.

  • Every unit passes a 4-agent release gate before customer ship.
  • BSVA (business-system validation) → VSVA (vendor & supplier verification) → LSVA (logistics & shipment validation) → SALA (sign-off & customer letter).
  • Each gate writes a SHA-256-chained entry to the platform audit log; any gate failure blocks shipment and pages the program owner.

Security In progress

How customer data, agent actions, and platform access are protected.

  • All access via Tailscale-only ingress (no public internet exposure to the platform).
  • Per-tenant SQLite isolation; tenant DBs at /var/lib/savrn/tenants/{slug}/savrn.db.
  • Argon2 password hashing, DB-backed session tokens (hashed at rest).
  • SHA-256-chained audit_events for tamper-evident logging.
  • Pending: SOC 2 Type I (est. Q4 2026), formal pen test (scheduled Q3 2026).
  • Penetration test scheduled for Q3 2026 with a Big Four firm. Findings will be folded into the SOC 2 Type I report.

Compliance In progress

Regulatory frameworks each AI Factory deployment must satisfy.

  • AI Factory deployments are scoped per-jurisdiction; required frameworks (NERC CIP, NIST 800-53 Low, etc.) are tracked per project on its Trust page.
  • Sovereign deployments (Panama, IVDC) include data-residency commitments in the contract; verification is part of the SALA gate.
  • Pending: ISO 27001 readiness assessment (est. Q1 2027).

Operations assurance Available

Live maintenance health for the deployed fleet — PMP completion, work order SLA.

  • Each AI Factory deployment publishes live PMP (Preventive Maintenance Program) completion and Work Order SLA metrics on its Trust page.
  • Customer-facing summary is a translated subset of the operator dashboard, produced by the customer-safe translation chain.
  • Per-project status appears at /projects/{slug}/trust once data starts flowing.

Commercial assurance In progress

Capacity guarantees, pricing transparency, performance SLAs.

  • MW commitments expressed per-deal in crm_deals.mw_commitment with revenue gate.
  • Token-tier pricing per channel is configurable, audited, and version-stamped.
  • Capacity model rolls up at /admin/portfolio; per-project capacity at /projects/{slug}.
  • Pending: published rate card + SLA credit schedule (drafting).

Sustainability (ESG) Roadmap

Environmental footprint, sustainability commitments, community impact.

  • Per-site grid mix, water consumption, and waste-heat reuse metrics in scope.
  • Vegas: planned WaterSense / LEED-aligned cooling design.
  • Panama: hydro-dominant grid baseline already favourable; verification work scheduled.
  • Target: first ESG summary published Q1 2027.
?