Water has replaced electricity as the sharpest local objection to data center development, and the rulemaking has moved faster than the measurement. Congress has generally deferred to state primacy over intrastate water allocation, so the binding rules are being written in state capitols and city halls while twenty-three federal bills sit in committee. The core problem is not that data centers use an extraordinary share of American water. It is that almost nobody is required to report how much they use, from where, or what they discharge.
Updated August 26, 202677 measures84 primary sources20 feeds polled weekly
Where the water actually goes
17.4 billion gallons211 billion gallons
U.S. data center water consumption in 2023. The copper bar is
direct cooling at the building. The grey bar is water consumed
generating the electricity that building runs on. Roughly twelve times more water
leaves at the power plant than at the site everyone is arguing about.
17.4Bgallons of water consumed directly by U.S. data centers in 2023, against 211B consumed indirectly at the power plants that run them
97%of water supplied to U.S. data centers comes from public water systems, not private wells
23bills in the 119th Congress touch data center water. One has become law, and it governs only military installations
Jan 1Virginia waterworks must begin reporting data center water sales as a separate category
The states
Fifty states, one taxonomy
Freshwater withdrawal by category, in billion gallons per year, from the U.S. Geological Survey's county-level compilation for 2015, the most recent year covering every state with a single taxonomy. Withdrawal is not consumption: most thermoelectric withdrawal is returned to its source, which is why that category leads in so many states. Fifteen states report irrigation only as a combined total with no golf breakdown, and those are labeled.
Click a state to open its file: the withdrawal ledger, every water measure that
binds there, the interstate basin bodies that reach it, and a state agency ledger where a
richer one exists. States with nothing located say so.
No state total published
No statewide or regional aggregate exists for Alabama, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
201.6 million galWithdrawal2024Named facility: Google Jackson County
182.8 million galConsumption2024Named facility: Google Jackson County
209 MLWithdrawal2024Named facility: Meta Huntsville
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for Alaska covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: No published Alaska volume; searched state and local sources. Paper cites only a generic national "300,000 gal/day" figure
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Regulates by municipal ordinance rather than state law, and has done so longest. Chandler capped data centers at 115 gallons per day per 1,000 square feet in 2015, a decade before the AI buildout. Golf course irrigation withdraws roughly 45 billion gallons a year here, which is the comparison most often made and most often made badly.
Freshwater withdrawal by category, USGS 2015
Crop irrigation1,608 billion gal
Public supply436 billion gal
Golf course irrigation45 billion gal
Thermoelectric power generation30 billion gal
Mining, including oil and gas25 billion gal
Livestock14 billion gal
Aquaculture13 billion gal
Domestic self-supplied9 billion gal
Industrial self-supplied2 billion gal
Data centers (statewide)905 million gal (2,777 acre-feet)
Use20250.04% of this state’s total withdrawal.
Statewide. Bluefield Research estimate, not an agency compilation; basis not separated into withdrawal/consumption
Other published figures for this state
~56 million gal/yrUse2025 (as reported)Named facility: Microsoft Goodyear
0.2 million galWithdrawal2024Named facility: Google Phoenix
57 MLWithdrawal2024Named facility: Meta Mesa
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
LocalEnactedAug 6, 2026
Large-scale data center standards No potable water for cooling, plus large-volume user compliance
Tucson, Arizona
Adopted 6-1. Applicants using Tucson Water must comply with the Large Quantity Water User Ordinance and demonstrate adequate water supply; applicants not covered by that ordinance may use no potable water for cooling. Council Member Schubert's amendments add one-year and two-year reviews of the ordinance.
news.azpm.org
LocalEnacted2015
2015 water-intensive business ordinance 115 gallons per day per 1,000 square feet
Chandler, Arizona
Restricts new water-intensive businesses from developing unless they align with the city's economic development plan, and limits data centers to 115 gallons per day per 1,000 square feet of space.
Phoenix New Times
LocalEnactedIn force
Large-volume water user ordinances Industrial usage caps with supplemental supply purchase
Mesa, Avondale and Phoenix, Arizona
Water utilities for Mesa, Avondale and the City of Phoenix have each adopted ordinances capping usage for industrial facilities and requiring developers to purchase supplemental water supplies if they wish to exceed those caps.
Irrigation (crop and golf combined)4,222 billion gal
Thermoelectric power generation527 billion gal
Public supply132 billion gal
Aquaculture92 billion gal
Industrial self-supplied57 billion gal
Livestock12 billion gal
Domestic self-supplied5 billion gal
Mining, including oil and gas1 billion gal
No measured figure published
Nobody publishes a data center water volume for Arkansas covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Only a share claim (0.01% of state water consumption, 2025, no volume) and a projection (AVAIO Wrightsville ~200,000 gal/day warm months)
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Passed a data center water reporting bill and had it vetoed, then reintroduced the duty at state level. Withdraws more water for crop irrigation than any other state by a wide margin.
Freshwater withdrawal by category, USGS 2015
Crop irrigation6,883 billion gal
Public supply1,860 billion gal
Aquaculture265 billion gal
Industrial self-supplied146 billion gal
Livestock67 billion gal
Domestic self-supplied46 billion gal
Golf course irrigation46 billion gal
Mining, including oil and gas17 billion gal
Thermoelectric power generation13 billion gal
Data centers (statewide)351 million gal (≈1,078 acre-feet)
Consumption20190.00% of this state’s total withdrawal.
Statewide, on-site only. Modeled by UC Riverside researchers, not measured; report says use more than doubled by 2023 and projects 1.12–1.75 billion gal by 2028 (projections excluded from this row)
Other published figures for this state
880 acre-feet/yr (≈260 million gal)Use — irrigation-district application, deniedApplied Apr 22, 2026Named project: Imperial Valley Computer Manufacturing LLC, Imperial County
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateVetoedOct 2025
AB 93 Data center water use reporting to local suppliers
California
Would have required operators to report estimated water use to the local water supplier before applying for a business license, and to report actual use annually on license renewal.
E&E News
StateProposed2026 session
AB 1577 Monthly energy and water reporting to the Energy Commission
California
Monthly reports to the State Energy Commission on energy and water consumption and effectiveness.
MultiState
LocalEnactedJun 2026
Data center development freeze Freeze running to June 2027 after a Colorado River water denial
Imperial County, California
The Board of Supervisors reversed an earlier project approval and adopted a 45-day freeze on data center development, later extended to roughly 10.5 months and running until June 2027.
No state total published
No statewide or regional aggregate exists for Colorado, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
~500,000 gal/month (average per data center)Use2026 (as reported by Aurora Water)City average across Aurora data centers
Up to 805,000 gal/dayUse — legislative-report projection2026Named facility: CoreSite north Denver
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for Connecticut covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Legislative record uses only the generic "up to 5 million gal/day" industry figure; no Connecticut facility volume published
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No state total published
No statewide or regional aggregate exists for Delaware, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
2,737,500 gal/yrDischarge (permit-application volume)Filing Jan 12, 2026Named application: Delaware data center
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for District of Columbia covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Interstate bodies reaching this state
Potomac River Basin: MD, VA, WV, PA, DC
The Interstate Commission on the Potomac River Basin maintains an assessment of data center water use in the basin that supplies the Washington region.
First state to enact a data center water statute. SB 484 requires reclaimed water where feasible, without defining who decides what is feasible.
Freshwater withdrawal by category, USGS 2015
Crop irrigation821 billion gal
Public supply808 billion gal
Thermoelectric power generation158 billion gal
Industrial self-supplied89 billion gal
Golf course irrigation72 billion gal
Domestic self-supplied65 billion gal
Mining, including oil and gas47 billion gal
Livestock10 billion gal
Aquaculture5 billion gal
No state total published
No statewide or regional aggregate exists for Florida, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
Up to 50,000 gal/dayUse — development-agreement allowance2026Named facility: Fort Meade LLC / Stonebridge, Fort Meade
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateEnactedMay 7, 2026
CS/CS/SB 484 Florida Hyperscale Data Center Act
Florida
Requires data centers to use reclaimed water where it is environmentally, economically and technically feasible; creates a permitting framework to protect aquifers and local water supplies; classifies facilities at 50 MW peak demand or above as large-scale; and preserves local authority to deny projects or impose stricter standards.
Carries both the strictest negotiated covenant located anywhere, in Columbia County, and the most documented local water failure, in Newton County. The two are 60 miles apart.
Freshwater withdrawal by category, USGS 2015
Public supply390 billion gal
Thermoelectric power generation270 billion gal
Crop irrigation257 billion gal
Industrial self-supplied174 billion gal
Domestic self-supplied38 billion gal
Aquaculture31 billion gal
Livestock16 billion gal
Golf course irrigation13 billion gal
Mining, including oil and gas7 billion gal
No state total published
No statewide or regional aggregate exists for Georgia, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
444.1 million galWithdrawal2024Named facility: Google Douglas County
366.9 million galConsumption2024Named facility: Google Douglas County
≥109 million gal (20.6 million on the first meter alone)UseFeb 2024 – Jul 2026Named facility: QTS Fayetteville (13 water lines)
146 MLWithdrawal2024Named facility: Meta Stanton Springs
12 mgd combined use; 3.16 mgd returned (>9 mgd evaporated)Use / discharge — DRI disclosures2026Partial-industry aggregate: 16 disclosing GA data centers (14 additional did not disclose)
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateProposed2026 session
SB 421 Ban on local nondisclosure agreements covering water use
Georgia
Would prohibit local governments from signing nondisclosure agreements with data center operators that conceal energy and water usage information.
MultiState
LocalEnactedDec 2025
Data Center Ordinance Industrial zoning with utility capacity requirements
Coweta County, Georgia
Permits data centers in light industrial and industrial districts subject to requirements on location, buffering, design standards, noise, lighting, traffic and utility capacity.
CBS News
LocalProposed2026 draft
Unified Development Ordinance revision Technology Campus district covering water resources
Newton County, Georgia
Would create a Technology Campus zoning district for data centers, require a minimum of 300 acres in TC or heavy industrial M2 districts, and require a conditional-use permit in either classification. The broader ordinance revision covers zoning, development regulations and water resources.
The Covington News
LocalEnactedJul 25, 2026
Google development covenant Closed loop required, no wells, water supply protections
Columbia County, Georgia
Google data centers at White Oak Technology Park between Appling and Harlem must operate as closed-loop systems that recycle cooling water rather than continuously drawing new water. The covenant also bars wells, sets decibel limits and lighting standards, requires minimal footprint and visibility, protects the local water supply, and requires an end-of-useful-life strategy.
wrdw.com
LocalEnacted2025 to 2026
Water system stress after Meta buildout The most documented local water case in the country
Newton County, Georgia
Reported effects rather than a rule. Residents reported dry taps, sediment and damaged appliances following construction of Meta's data center. County water rates are set to rise 33% from 2025 to 2027 against a usual 2% annual increase, and a 2025 report warns the county is on track for a water deficit by 2030.
Irrigation (crop and golf combined)140 billion gal
Public supply97 billion gal
Aquaculture7 billion gal
Domestic self-supplied3 billion gal
Livestock1 billion gal
Thermoelectric power generation0 billion gal
Mining, including oil and gas0 billion gal
Industrial self-supplied0 billion gal
No measured figure published
Nobody publishes a data center water volume for Hawaii covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Testimony cites only generic national figures; no Hawaii facility volume published
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for Idaho covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Meta Kuna projected at ~70,000 gal/day average; site not yet operating, so no reported period. Meta says annual figures will publish once operational
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No state total published
No statewide or regional aggregate exists for Illinois, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
105 MLWithdrawal2024Named facility: Meta DeKalb
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateProposedFeb 11, 2026
POWER Act Water withdrawal and discharge disclosure with IEPA permitting
Illinois
Would require data centers to disclose total water use including both the amount drawn in and the volume discharged, secure water permits from the Illinois EPA, and meet water efficiency requirements enforced by the agency.
Shaw Local News Network
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
Eleven counties with data center ordinances, at least seventeen with temporary moratoria, and two outright bans. Marion County barred new construction through the end of 2027.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation1,395 billion gal
Industrial self-supplied835 billion gal
Public supply229 billion gal
Domestic self-supplied46 billion gal
Crop irrigation46 billion gal
Mining, including oil and gas46 billion gal
Livestock14 billion gal
Aquaculture5 billion gal
Golf course irrigation2 billion gal
No state total published
No statewide or regional aggregate exists for Indiana, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
31 mgdConstruction dewatering discharge — county-approved2026Named facility: Amazon New Carlisle
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
LocalEnactedAug 10, 2026
Construction bar through 2027 County-wide pause on new data center construction
Indianapolis and Marion County, Indiana
The City-County Council voted 23-1 to bar new data center construction in Marion County through the end of 2027.
WFYI
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
No state total published
No statewide or regional aggregate exists for Iowa, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
1,410.3 million galWithdrawal2024Named facility: Google Council Bluffs
1,010.2 million galConsumption2024Named facility: Google Council Bluffs
~1.3 billion galUse2025Named facility: Google Council Bluffs
48,751,325 galUseJan–Sep 2025Named facilities: Microsoft's West Des Moines sites
242 MLWithdrawal2024Named facility: Meta Altoona
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateProposed2026 session
HF 2447 Quarterly water use reporting to Iowa DNR
Iowa
Quarterly water usage reports submitted to the Iowa Department of Natural Resources.
MultiState
StateFailed2026 session
HF 2261 Separate water customer class for large loads
Iowa
Would have required water utilities serving facilities that need 20 MW of power or more to create a separate customer class with distinct rates.
No measured figure published
Nobody publishes a data center water volume for Kansas covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Only figure is a Triple Oak Power projection near Garden City of 600 million gal/yr. The 9.5 MGD Meta contract in the Kansas City area is on the Missouri side (KSHB 41)
U.S. Geological Survey
Water measures in this state
StateProposed2026 session
SB 400 Closed-loop cooling requirement with private right of action
Kansas
Would require closed-loop cooling systems and allow municipalities and the attorney general to sue for violations.
No measured figure published
Nobody publishes a data center water volume for Kentucky covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Only figure is a developer projection of ~55 million gal/yr (Rubix, Russell)
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Irrigation (crop and golf combined)384 billion gal
Public supply259 billion gal
Aquaculture180 billion gal
Domestic self-supplied14 billion gal
Mining, including oil and gas2 billion gal
Livestock2 billion gal
No state total published
No statewide or regional aggregate exists for Louisiana, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
>23 mgd; 8.4 billion gal/yrWithdrawal — registered ceilingCurrent registrationNamed facility: Meta Hyperion, Richland Parish
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
StateEnactedIn force
Groundwater registration Registration threshold at 50,000 gallons per day
Louisiana
Registration is required only for groundwater use exceeding 50,000 gallons per day.
Came closer than any state to the first statewide ban before New York enacted one. The legislature passed a moratorium and the governor vetoed it.
Freshwater withdrawal by category, USGS 2015
Industrial self-supplied66 billion gal
Public supply31 billion gal
Aquaculture20 billion gal
Domestic self-supplied12 billion gal
Crop irrigation6 billion gal
Mining, including oil and gas2 billion gal
Thermoelectric power generation2 billion gal
Golf course irrigation1 billion gal
Livestock1 billion gal
No measured figure published
Nobody publishes a data center water volume for Maine covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Only figure is a Sanford proposal at 300,000–500,000 gal/day. Maine's own Data Center Advisory Council substitutes Oregon data (Google The Dalles, 434 million gal, 2024) for lack of Maine numbers (Governor's Energy Office slides)
U.S. Geological Survey
Water measures in this state
StateVetoedApr 2026
2026 moratorium bill Statewide data center moratorium
Maine
Would have imposed a statewide moratorium on new data center construction.
No measured figure published
Nobody publishes a data center water volume for Maryland covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: [GOV] Authoritative negative: MDE states on the record it has **not issued a data-center-specific water-appropriations permit to date**. Quantum Frederick holds a 0.2 MGD max-day potable allocation (Aug 2024 LOU) — an allocation, not use. Maryland use appears only inside ICPRB's ~4 mgd WMA aggregate
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Interstate bodies reaching this state
Susquehanna River Basin: NY, PA, MD
Any data center consumptively using 20,000 gallons per day or more on a 30-day average requires Commission approval, including when the water comes from a public water supply, stormwater, wastewater or recycled sources. These are issued as Approval by Rule type (e), a general permit process in place since 2007.
srbc.gov
Potomac River Basin: MD, VA, WV, PA, DC
The Interstate Commission on the Potomac River Basin maintains an assessment of data center water use in the basin that supplies the Washington region.
No measured figure published
Nobody publishes a data center water volume for Massachusetts covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: No Massachusetts facility volume published; coverage carries only the generic industry figure
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Inside the Great Lakes Compact. The state tax exemption limits municipal water to systems with available capacity, so a facility that self-sources faces the basin rules instead.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation2,848 billion gal
Public supply376 billion gal
Industrial self-supplied189 billion gal
Crop irrigation112 billion gal
Domestic self-supplied68 billion gal
Mining, including oil and gas31 billion gal
Aquaculture27 billion gal
Golf course irrigation9 billion gal
Livestock9 billion gal
No measured figure published
Nobody publishes a data center water volume for Michigan covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: [GOV] EGLE 2024 water-use data show Commercial 4.3 mgd withdrawal / 0.4 mgd consumptive statewide and Industrial 609 / 60.9 mgd — **no data-center category**. Saline Township FAQ (Jan 28, 2026) gives Related Digital campus ~20,000 gal/day anticipated
U.S. Geological Survey
Water measures in this state
StateProposed2026 session
SB 762 Annual utility reporting of data center water use
Michigan
Annual reports to the Public Service Commission detailing total water used by each data center in a utility's service area.
MultiState
StateEnactedIn force
Data center tax exemption law Municipal water capacity condition on tax breaks
Michigan
Data centers receiving the state tax exemption may use municipal water only from a system with available capacity.
circleofblue.org
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
No measured figure published
Nobody publishes a data center water volume for Minnesota covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Five projections only: Tract Farmington 2.93 MGD; CloudHQ Chaska ~1.5 MGD peak; Meta Rosemount 100,000 gal/day peak; Oppidan Apple Valley ~8 million gal/yr; Hampton scenario up to 12.5 million gal/yr
U.S. Geological Survey
Water measures in this state
LocalProposedJul 2026
Proposed moratorium Moratorium triggered by water volume
North Mankato, Minnesota
Would impose a moratorium on large data centers over 150,000 square feet or using more than 50,000 gallons of water daily, pending further public input and a council vote.
WFYI
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
Irrigation (crop and golf combined)646 billion gal
Public supply146 billion gal
Industrial self-supplied66 billion gal
Aquaculture46 billion gal
Thermoelectric power generation43 billion gal
Domestic self-supplied18 billion gal
Livestock6 billion gal
Mining, including oil and gas3 billion gal
No measured figure published
Nobody publishes a data center water volume for Mississippi covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: The only Mississippi number is an avoided-use claim: >80 million gal/yr of drinking water expected to be conserved by 2030. AWS discloses no site-level use
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Irrigation (crop and golf combined)501 billion gal
Public supply291 billion gal
Aquaculture60 billion gal
Industrial self-supplied31 billion gal
Livestock23 billion gal
Domestic self-supplied21 billion gal
Mining, including oil and gas11 billion gal
No state total published
No statewide or regional aggregate exists for Missouri, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
41 MLWithdrawal2024Named facility: Meta Kansas City
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
LocalProposed2026
Draft water-use limits Water limits for any new industry, including data centers
Festus, Missouri
A city council member is drafting ordinances that would set limits on water use for any new industry, including data centers.
Irrigation (crop and golf combined)3,450 billion gal
Public supply56 billion gal
Thermoelectric power generation28 billion gal
Livestock15 billion gal
Domestic self-supplied9 billion gal
Mining, including oil and gas8 billion gal
Aquaculture6 billion gal
Industrial self-supplied4 billion gal
No state total published
No statewide or regional aggregate exists for Montana, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
~16 million gal/yr; ~44,000 gal/day annual avg; 267,000 gal/day summer avgUse — projection at full build-out (200 MW)Committee report Feb 2026Named facility: Sabey Butte, Montana Connections Industrial Park
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Irrigation (crop and golf combined)2,223 billion gal
Thermoelectric power generation1,065 billion gal
Public supply100 billion gal
Livestock40 billion gal
Industrial self-supplied16 billion gal
Aquaculture10 billion gal
Domestic self-supplied7 billion gal
Mining, including oil and gas4 billion gal
Data centers (regional aggregate)732.1 million gal
Consumption20250.02% of this state’s total withdrawal.
Named facilities: Google Omaha, Papillion, Lincoln (state total). Company-reported; same basis 134.7 million gal (2023) and 46.6 million gal (2022) — a 15x rise in three years
Other published figures for this state
532.3 million gal (Papillion) + 44.3 million gal (Omaha)Withdrawal2024Named facilities: Google Papillion, Google Omaha
416.9 million gal (Papillion) + 32.1 million gal (Omaha)Consumption2024Named facilities: Google Papillion, Google Omaha
142 MLWithdrawal2024Named facility: Meta Sarpy County
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
A water district and a city council moved within weeks of each other, in a state where a large share of capacity sits in high or extremely high water stress areas.
Freshwater withdrawal by category, USGS 2015
Crop irrigation743 billion gal
Public supply194 billion gal
Mining, including oil and gas71 billion gal
Domestic self-supplied13 billion gal
Aquaculture12 billion gal
Golf course irrigation11 billion gal
Thermoelectric power generation3 billion gal
Industrial self-supplied2 billion gal
Livestock2 billion gal
Data centers (regional aggregate)>716 million gal
Use20240.07% of this state’s total withdrawal.
Regional aggregate: 23 named Southern Nevada data centers (incl. Google Henderson ~352 million gal, Flexential North Las Vegas ~20 million gal). Lists supplied by Las Vegas Valley Water District, North Las Vegas and Henderson — closest thing to a regional registry in the U.S.; basis not separated
Other published figures for this state
359.9 million gal (Henderson) + 14.9 million gal (Storey County)Withdrawal2024Named facilities: Google Henderson, Google Storey County
207.4 million gal (Henderson) + 1.5 million gal (Storey County)Consumption2024Named facilities: Google Henderson, Google Storey County
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
LocalProposedMay 27, 2026
Water District emergency order Emergency order seeking a Pahrump Valley moratorium
Nye County, Nevada
The Nye County Water District Governing Board unanimously approved an emergency order requesting that the County Commission place a moratorium on data centers in the Pahrump Valley.
nevadacurrent.com
LocalEnactedMay 2026
Application pause Temporary pause on new data center applications
Reno, Nevada
The Reno City Council placed a temporary pause on new data center applications.
No measured figure published
Nobody publishes a data center water volume for New Hampshire covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Legislative debate uses only the generic 5 MGD figure; no New Hampshire facility volume published
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for New Jersey covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: [GOV] Authoritative negative: NJDEP told the Legislature it "does not currently have sufficient data to determine the exact water usage for data centers in New Jersey" and has **no access to data for facilities served by public water systems**. 2024 Statewide Water Supply Plan does not identify data-center use. Only projection: DataOne/Nebius Vineland ~20 million gal/yr
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
StateVetoed2026
S4293 Water and energy usage reporting to the Board of Public Utilities
New Jersey
Would have required operators to submit water and energy usage reports, including the source of the water, to the Board of Public Utilities.
E&E News
LocalProposed2026
Planning Board recommendations Data center rules referred to Town Council
Lopatcong Township, New Jersey
The Planning Board referred a set of recommendations on data center rules to the Town Council for adoption.
No state total published
No statewide or regional aggregate exists for New Mexico, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
252 MLWithdrawal2024Named facility: Meta Los Lunas
213.40 acre-ft/yr (~69.5 million gal)Use — reported average annual2025Named facility: Meta Los Lunas
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
The first state to impose a statewide moratorium, and the largest single water study any state has ordered: the statewide environmental review must examine water consumption directly.
Freshwater withdrawal by category, USGS 2015
Public supply885 billion gal
Thermoelectric power generation807 billion gal
Industrial self-supplied114 billion gal
Domestic self-supplied68 billion gal
Aquaculture22 billion gal
Mining, including oil and gas15 billion gal
Crop irrigation10 billion gal
Livestock9 billion gal
Golf course irrigation9 billion gal
No measured figure published
Nobody publishes a data center water volume for New York covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Only claim found is a share (0.2% of New York water, 2025) with no volume and no primary source. No state agency, utility or operator publishes New York data center volumes
U.S. Geological Survey
Water measures in this state
StateEnactedJul 2026
Executive Order First statewide moratorium on new hyperscale data centers
New York
Bars construction of new hyperscale data centers drawing 50 MW or more, and directs a statewide environmental review that must examine energy use, water consumption, land use, pollution and impacts on disadvantaged communities.
governor.ny.gov
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
greatlakes.org
Susquehanna River Basin: NY, PA, MD
Any data center consumptively using 20,000 gallons per day or more on a 30-day average requires Commission approval, including when the water comes from a public water supply, stormwater, wastewater or recycled sources. These are issued as Approval by Rule type (e), a general permit process in place since 2007.
No state total published
No statewide or regional aggregate exists for North Carolina, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
351.7 million galWithdrawal2024Named facility: Google Lenoir
327.8 million galConsumption2024Named facility: Google Lenoir
16 MLWithdrawal2024Named facility: Meta Forest City
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
LocalProposed2026
Proposed one-year moratorium Moratorium following a withdrawn campus application
Apex, North Carolina
Moved toward a one-year moratorium on data centers after the proposed New Hill Digital Campus was withdrawn.
No state total published
No statewide or regional aggregate exists for North Dakota, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
0.00486 mgd (4,860 gal/day)Discharge — NDPDES-authorized (seasonal)Application Nov 1, 2023; public notice May 15, 2024Named facility: APLD Jamestown
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Data centers (regional aggregate)1,263,063,480 gal
UseMay 2025 – May 20260.05% of this state’s total withdrawal.
Regional aggregate: 115 data center addresses served by Columbus Water & Power (incl. Amazon, Meta, Google). Strongest municipal aggregate in the country; obtained by records request, drinking-quality water, basis not separated
Other published figures for this state
405.3 (New Albany) + 207.4 (Lancaster) + 177.3 (Lockbourne) million galWithdrawal2024Named facilities: Google New Albany, Lancaster, Lockbourne
352.7 (New Albany) + 101.1 (Lancaster) + 143.3 (Lockbourne) million galConsumption2024Named facilities: Google New Albany, Lancaster, Lockbourne
86 MLWithdrawal2024Named facility: Meta New Albany
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateEnactedIn force
Lake Erie watershed rule Consumptive-use permit above 1 million gallons per day
Ohio
In the Lake Erie watershed, any facility proposing new or increased withdrawals above 1 million gallons per day must obtain a consumptive-use permit and demonstrate no significant adverse impact.
Control Associates
StateProposed2026 session
Data center cooling and tariff legislation Cooling, rate-class and tariff requirements
Ohio
Would impose new cooling requirements, a separate rate class, and tariff conditions on data centers.
bondbuyer.com
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
Irrigation (crop and golf combined)340 billion gal
Public supply223 billion gal
Thermoelectric power generation26 billion gal
Livestock26 billion gal
Industrial self-supplied19 billion gal
Mining, including oil and gas14 billion gal
Domestic self-supplied11 billion gal
Aquaculture1 billion gal
No state total published
No statewide or regional aggregate exists for Oklahoma, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
>1.1 billion galUseJul 1, 2024 – Jun 30, 2025Named facility: Google Pryor (Mayes County)
~150 million galUseJul 1, 2024 – Jun 30, 2025Named facilities: Polaris Technologies, Muskogee
1,108.3 million galWithdrawal2024Named facility: Google Mayes County
833.2 million galConsumption2024Named facility: Google Mayes County
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
StateEnactedApproved May 20, 2026
SB 259 Groundwater Modernization Act
Oklahoma
Data centers are barred from using groundwater in open-air evaporative cooling systems, or in any other system that consumes groundwater through evaporation without recirculation. To obtain a groundwater permit a data center must demonstrate low-consumptive cooling technology such as a closed loop or dielectric immersion system. Water permit holders file annual water use reports with the Oklahoma Water Resources Board, which is directed to write rules for reviewing those reports, investigating waste complaints and penalizing overuse.
No state total published
No statewide or regional aggregate exists for Oregon, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
434.4 million gal (1.19 MGD)Use2024Named facilities: Google's two The Dalles data centers
461.1 million galWithdrawal2024Named facility: Google The Dalles
361.4 million galConsumption2024Named facility: Google The Dalles
328 MLWithdrawal2024Named facility: Meta Prineville
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Sits under the Susquehanna River Basin Commission, which requires approval above 20,000 gallons per day of consumptive use and had issued exactly one hyperscale permit as of early 2026.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation1,306 billion gal
Public supply508 billion gal
Industrial self-supplied235 billion gal
Domestic self-supplied76 billion gal
Aquaculture35 billion gal
Livestock14 billion gal
Mining, including oil and gas14 billion gal
Golf course irrigation8 billion gal
Crop irrigation4 billion gal
No state total published
No statewide or regional aggregate exists for Pennsylvania, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
0.129 mgd (129,000 gal/day), 30-day avgConsumption — SRBC-approved limitApproved Sept 12, 2024; increased Mar 12, 2026Named facility: Amazon Data Services PHL100, Salem Twp., Luzerne Cnty.
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
greatlakes.org
Susquehanna River Basin: NY, PA, MD
Any data center consumptively using 20,000 gallons per day or more on a 30-day average requires Commission approval, including when the water comes from a public water supply, stormwater, wastewater or recycled sources. These are issued as Approval by Rule type (e), a general permit process in place since 2007.
srbc.gov
Potomac River Basin: MD, VA, WV, PA, DC
The Interstate Commission on the Potomac River Basin maintains an assessment of data center water use in the basin that supplies the Washington region.
No measured figure published
Nobody publishes a data center water volume for Puerto Rico covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for Rhode Island covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: No data center category in state water-use compilations and no facility disclosure found
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Considering the strictest state instrument in the country, HB 4583, which would require zero net water withdrawal and bar groundwater and municipal water for cooling outright.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation1,818 billion gal
Public supply231 billion gal
Industrial self-supplied104 billion gal
Domestic self-supplied43 billion gal
Crop irrigation40 billion gal
Golf course irrigation6 billion gal
Mining, including oil and gas4 billion gal
Livestock4 billion gal
Aquaculture2 billion gal
No state total published
No statewide or regional aggregate exists for South Carolina, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
853.8 million galWithdrawal2024Named facility: Google Berkeley County
776.5 million galConsumption2024Named facility: Google Berkeley County
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateProposed2026 session
HB 4583 Zero net withdrawal closed-loop mandate
South Carolina
Would require closed-loop systems achieving zero net water withdrawal and net zero wastewater discharge, and prohibit extraction of groundwater and municipal water for cooling.
MultiState
LocalProposed2026
Gigawatt campus application First proposed gigawatt campus in the state
Colleton County, South Carolina
An 860-acre, approximately $6 billion campus proposed for the Lowcountry would be South Carolina's first gigawatt-scale data center. Residents and elected officials packed a county civic center meeting to oppose it.
Enacted a Data Center Bill of Rights requiring full transparency of water use and compatibility with local supply, while rejecting a moratorium.
Freshwater withdrawal by category, USGS 2015
Irrigation (crop and golf combined)77 billion gal
Public supply26 billion gal
Livestock18 billion gal
Aquaculture10 billion gal
Industrial self-supplied9 billion gal
Mining, including oil and gas3 billion gal
Domestic self-supplied2 billion gal
Thermoelectric power generation1 billion gal
No state total published
No statewide or regional aggregate exists for South Dakota, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
~4,000 gal/month total; ~200,000 gal initial fill; 0.314 gal/server/monthUse — closed-loop fill and make-up (30:70 glycol:water)Filing Nov 7, 2024Named facility: Leola Data Center
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
StateEnactedMar 30, 2026
SB 135 Data Center Bill of Rights for Citizens
South Dakota
Requires full transparency of data center water usage, requires operators to work with water service providers so that their use is compatible with local supply, and gives counties and municipalities authority to decide whether a data center is welcome.
Home to the largest operator-funded water mitigation in the country, the Colossus recycling facility, which was still awaiting permits when last reported.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation1,686 billion gal
Public supply310 billion gal
Industrial self-supplied268 billion gal
Aquaculture21 billion gal
Crop irrigation19 billion gal
Domestic self-supplied16 billion gal
Mining, including oil and gas11 billion gal
Livestock9 billion gal
Golf course irrigation4 billion gal
No state total published
No statewide or regional aggregate exists for Tennessee, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
53.4 million galUse2025Named facility: Meta Gallatin
205 MLWithdrawal2024Named facility: Meta Gallatin
387.9 million galWithdrawal2024Named facility: Google Montgomery County
321.8 million galConsumption2024Named facility: Google Montgomery County
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
LocalProposed2026
Colossus Water Recycling Facility Operator-funded greywater plant in place of aquifer withdrawal
Memphis, Tennessee
An approximately $80 million wastewater recycling facility, a collaboration between xAI, the Tennessee Valley Authority and Nucor Steel, designed to process up to 13 million gallons of wastewater daily and to eliminate the need to draw from the Memphis Aquifer, with a stated goal of reducing aquifer strain by 9%.
The most contested market in the country and the origin of the 49 billion gallon figure. The Water Development Board has stated it cannot track groundwater pumping by data centers in counties without a groundwater conservation district, which is more than half of Texas counties. San Angelo wrote the most precise local water ordinance located anywhere.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation3,519 billion gal
Irrigation (crop and golf combined)2,004 billion gal
Public supply1,045 billion gal
Industrial self-supplied118 billion gal
Livestock101 billion gal
Domestic self-supplied50 billion gal
Mining, including oil and gas48 billion gal
Aquaculture8 billion gal
Data centers (statewide)25 billion gal
Use (direct + indirect, modeled)20250.36% of this state’s total withdrawal.
Statewide. ~0.4% of Texas water use; the authors state they have no access to facility-level operator-reported Texas data. Scenario projections (43.5 billion gal by 2025-series, 223.6 billion by 2030, 345.5 billion by 2040) are excluded here
Other published figures for this state
463 million galUse2023–2024 combinedNamed facilities: San Antonio Microsoft and Army Corps data centers
221.0 (Midlothian) + 1.9 (Wilmer) + 0.1 (Pflugerville) million galWithdrawal2024Named facilities: Google Midlothian, Wilmer, Pflugerville
182.3 (Midlothian) + 0.2 (Wilmer) + 0.01 (Pflugerville) million galConsumption2024Named facilities: Google Midlothian, Wilmer, Pflugerville
311 MLWithdrawal2024Named facility: Meta Fort Worth
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
State agency ledger, Texas Water Development Board
2023, basis: use.
Total 4,888 billion gal.
Agricultural irrigation2,411 billion gal
Municipal (residential and commercial)1,694 billion gal
Residential total (indoor and outdoor)1,065 billion gal
Statewide landscape irrigation619 billion gal
Manufacturing391 billion gal
Residential outdoor only (lawns and pools)330 billion gal
Steam-electric power generation195 billion gal
Municipal water lost to pipe leaks150 billion gal
Mining, including oil and gas98 billion gal
Livestock98 billion gal
Texas data centers~25 billion gal
The Texas Water Development Board publishes a use-based estimate with residential, landscape and pipe-loss categories that USGS does not break out. It reports 4,888 billion gallons of use for 2023 against the USGS figure of 6,892 billion gallons withdrawn in 2015. Those are different quantities from different agencies in different years, and the gap between them is the reason this page labels a basis on every row.
Texas Water Development Board
Water measures in this state
StateProposedJun 24, 2026
2026 interim charges Legislative review of data center water demand
Texas
House Speaker Burrows and Lieutenant Governor Patrick placed data center water demand in the 2026 interim charges for five legislative panels, including House Natural Resources and the Senate Committee on Water, Agriculture and Rural Affairs, to draft recommendations ahead of the 90th Legislature.
KWTX
StateProposedApr 16, 2026
Blanco-Pedernales GCD resolution Groundwater district request for authority to deny data center permits
Texas
The Blanco-Pedernales Groundwater Conservation District passed a resolution urging the Texas Legislature to grant it the legal authority to deny water permits to data centers.
The Texas Dispatch
LocalEnactedJun 16, 2026
Data center water ordinance Closed-loop mandate with a per-square-foot fill cap
San Angelo, Texas
Requires any data center to use a closed-loop cooling system, limits the initial water fill to no more than 8 gallons per square foot of gross building area, requires cooling water to be metered separately from other water use, and requires any approved or emergency exceedance to be reported in writing to the City Council within five business days.
San Angelo LIVE
LocalProposedJul 8, 2026
Data center zoning ordinance Proposed closed-loop cooling requirement
Fort Worth, Texas
Would require data centers to be equipped with closed-loop cooling systems that recycle water and reduce evaporative loss, as part of a first-of-its-kind zoning and development ordinance for the city.
Fort Worth Report
StateEnactedEffective Sep 1, 2021
Government Code 552.1331 (H.B. 872, 87th Legislature) Smart meter records exception used to withhold data center water use
Texas
Information a government-operated utility collects through an advanced metering system for usage, services and billing is excepted from disclosure under the Public Information Act. The utility must release the data to the customer it belongs to, and to nobody else.
ksat.com
LocalProposedAug 26, 2026
Large-load data center resolution Zoning and water requirements written before the first hyperscale site
Austin, Texas
A City Council resolution, set for debate and a vote on August 27, 2026, directs work on a definition for high-impact data centers and a review process that would require developers to seek additional city approval. Planning staff also recommend new requirements covering water use, noise, heat and lighting, and a statement in the city's economic development policy that Austin will not incentivize data center construction.
No measured figure published
Nobody publishes a data center water volume for U.S. Virgin Islands covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No state total published
No statewide or regional aggregate exists for Utah, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
>126 million gal (~390 acre-feet)UseOct 2024 – Sep 2025Named facility: NSA Utah Data Center, Bluffdale
80 million gal (Aligned West Valley); 47.4 million (Aligned West Jordan); 19.5 million (eBay South Jordan); 7.7 million (DataBank Bluffdale); 3 million (Novva West Jordan)UseOct 2024 – Sep 2025Named facilities as listed
133 MLWithdrawal2024Named facility: Meta Eagle Mountain
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateEnactedEffective May 6, 2026
H.B. 76 Data Center Water Transparency Amendments
Utah
A large data center, defined as a facility withdrawing 75 acre-feet a year or more across one or more buildings totalling 10,000 square feet or more, must notify its water provider of anticipated water consumption between 90 and 360 days before construction begins, and report to the Division of Water Rights its estimated annual withdrawal, discharge treatment plans, any discharge temperature adjustment and any planned water reuse. Operating facilities report annually by July 1, and the division publishes aggregated, anonymized data by September 1. The state engineer may fine a non-reporting operator up to $100 a day.
Utah Legislature
LocalEnacted2022
Large water user ordinance Industries above 200,000 gallons per day barred
Salt Lake City, Utah
Adopted an ordinance barring industries that use more than 200,000 gallons of water a day.
No measured figure published
Nobody publishes a data center water volume for Vermont covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: Legislative record states Vermont currently has no AI or crypto data centers, so no volume exists to publish
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
The largest data center market in the world, and the only state where routine utility reporting will break out data center water as its own category, from January 2027. The July 2026 state groundwater study found declines are likely in a critical eastern aquifer and asked for authority to reject industrial withdrawal permits.
Freshwater withdrawal by category, USGS 2015
Thermoelectric power generation1,064 billion gal
Public supply250 billion gal
Industrial self-supplied135 billion gal
Domestic self-supplied46 billion gal
Aquaculture41 billion gal
Crop irrigation13 billion gal
Livestock10 billion gal
Mining, including oil and gas9 billion gal
Golf course irrigation6 billion gal
Data centers (statewide)2.1 billion gal (≈5.75 MGD)
Use20230.13% of this state’s total withdrawal.
Statewide (utility-reported, building level, anonymized). The only true statewide government accounting in the U.S.; just over one-third reclaimed water; ~0.5% of state water use, up 86% since 2019 (Cardinal News)
Other published figures for this state
243 million gal (single largest building); 11 buildings >50 million gal eachUse2023Named scope: unidentified individual buildings
59.5 (Ashburn) + 105.7 (Bristow) + 246.7 (Leesburg) + 201.2 (Sterling) million galWithdrawal2024Named facilities: Google Ashburn, Bristow, Leesburg, Sterling
56.0 (Ashburn) + 84.4 (Bristow) + 191.6 (Leesburg) + 158.2 (Sterling) million galConsumption2024Named facilities: Google Ashburn, Bristow, Leesburg, Sterling
92 MLWithdrawal2024Named facility: Meta Henrico
~4 MGD average, ~15 MGD peakConsumption2025Regional: Washington metro area, dominated by Northern Virginia
19.6 million gal/dayUse — locality-committed supply allowanceCommitted as of Jun 2026Named operator: Amazon campuses in Louisa, Spotsylvania, Caroline and Stafford counties
2 million gal/day contracted, up to 8 million gal/day on requestUse — contracted municipal supply allowanceAgreement executed Oct 14, 2025Named project: Google campus at Botetourt Center at Greenfield, served by the Western Virginia Water Authority
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
StateEnactedEffective Jan 1, 2027
Waterworks regulations Data center water sales reporting category
Virginia
Waterworks operators must categorize monthly sales reporting data, breaking out usage by data centers holding state air permits separately from domestic, industrial and commercial, and other uncategorized purposes.
VPM
StateVetoed2025 session
HB 1601 Local authority over water resource impact assessments
Virginia
Would have required assessment of noise impacts and authorized local governments to require water resource impact assessments for data center projects.
E&E News
StateFailed2026 session
SB 417 Treated wastewater condition on state grant funding
Virginia
Would have conditioned state grant funding for data centers on the use of treated wastewater in cooling systems.
MultiState
StateProposed2026 session
SB 30 / HB 30 Budget amendments conditioning data center tax treatment
Virginia
Would condition the data center tax credit on investments in environmental management. The House version would eliminate the sales tax exemption.
MultiState
LocalEnacted2026
Utility metering analyses Measured per-building water use in the largest U.S. data center market
Fairfax and Prince William Counties, Virginia
Utility-provided analyses report average daily use of roughly 18,000 to 38,000 gallons per day per building, with peak-day demand approaching 88,000 gallons per day, and substantial variability among facilities.
Center for Secure Water, University of Illinois
StateEnactedJul 28, 2026
Eastern Virginia groundwater study State study urging authority to reject industrial withdrawal permits
Virginia
The long-delayed state groundwater study found declines are likely in a critical eastern Virginia aquifer from population growth and industrial use, and recommended that regulators be given more authority to reject industrial water withdrawal permits, to require applicants to examine alternative water sources, and to act against users drawing more than they should.
VPM
Interstate bodies reaching this state
Potomac River Basin: MD, VA, WV, PA, DC
The Interstate Commission on the Potomac River Basin maintains an assessment of data center water use in the basin that supplies the Washington region.
No state total published
No statewide or regional aggregate exists for Washington, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
~210 million gal/yr implied (10% of ~2.1 billion gal/yr city groundwater used by data centers for cooling)Use — municipal withdrawal share as characterized by EPACase study period; reuse utility operational June 30, 2021City of Quincy data-center cluster
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
No measured figure published
Nobody publishes a data center water volume for West Virginia covering a stated
period. USGS has no data center category, and the disclosure bills tracked on this page
exist because that figure is not collected. What exists is projection only: 2026 legislation only *urges* developers to study potential water use; no volumes published, only the generic "up to 5 MGD"
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Interstate bodies reaching this state
Potomac River Basin: MD, VA, WV, PA, DC
The Interstate Commission on the Potomac River Basin maintains an assessment of data center water use in the basin that supplies the Washington region.
Irrigation (crop and golf combined)168 billion gal
Industrial self-supplied140 billion gal
Domestic self-supplied28 billion gal
Livestock27 billion gal
Aquaculture18 billion gal
Mining, including oil and gas11 billion gal
No state total published
No statewide or regional aggregate exists for Wisconsin, so no bar is drawn.
The figures below are what has been published, and they are not additive: different
operators, bases, periods and instruments, with most facilities in the state
disclosing nothing at all.
Other published figures for this state
1.2 mgdUse — contracted municipal supply allowance (Lake Michigan via Port Washington)2025 agreement in forceNamed facility: Lighthouse campus (Vantage, for Oracle/OpenAI), Port Washington
Listed as published. Different bases, periods and scopes: not additive,
and none of them is a state total.
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
StateProposed2026 session
Draft moratorium package Statewide moratorium conditioned on a protections package
Wisconsin
Circulated draft legislation would prohibit data center operation until the legislature enacts a package of protections, including a statewide planning authority and explicit bans on shifting data center energy and water costs onto residential customers.
bondbuyer.com
Interstate bodies reaching this state
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
Irrigation (crop and golf combined)2,843 billion gal
Public supply37 billion gal
Thermoelectric power generation19 billion gal
Mining, including oil and gas16 billion gal
Aquaculture10 billion gal
Livestock6 billion gal
Domestic self-supplied3 billion gal
Industrial self-supplied3 billion gal
Data centers (regional aggregate)~200 acre-feet/yr (≈65 million gal)
Use2026 (as reported to legislators)0.00% of this state’s total withdrawal.
City aggregate: Cheyenne's 13 active data center buildings. Mayor's legislative testimony, not a published dataset; equals ~1.48% of Cheyenne's water. A legislator's 20–30 MGD estimate for Project Jade is disputed by the developer and excluded
This state reports irrigation as a single combined total. USGS publishes no crop and golf breakdown for it, so none is shown.
U.S. Geological Survey
Water measures in this state
No state or local water measure located. That is the absence of a rule, not the absence of data centers.
Figure 1
Water is consumed twice on the way to a server, and the larger draw is the one no rule in this tracker measures. Twelve times more leaves at the power plant than at the building, and that ratio moves with the generation mix: about 2.1 gallons per kilowatt-hour in the hydropower-heavy Pacific Northwest against 0.13 in solar-heavy California. A facility can hold a near-zero water use effectiveness score and still carry a large footprint through its power purchase.
The number that got corrected
49 billion gallons became 25
49 billion gallons→~25 billion gallonsHouston Advanced Research Center July 2025 to January 21, 2026
HARC's preliminary estimate of 2025 Texas data center water use was 49 billion gallons. Its formal report of January 21, 2026 revised the figure to approximately 25 billion gallons including direct and indirect use. The original number was carried by national and regional outlets; most did not publish the correction. HARC's revised 2030 range is 29 to 161 billion gallons, a spread of 5.5 times, and the variable that decides where in that range Texas lands is cooling architecture adoption.
Houston Advanced Research CenterSAVRN, The 49 Billion Gallon Mirage
The tracker
77 measures, 26 states, one federal law
Every instrument located that governs, discloses, restricts or subsidizes data
center water use. Federal bills are compiled from the Congressional Research Service report of
July 31, 2026. State and local entries are drawn from legislative records, agency regulations,
council minutes and local reporting. The regional layer covers interstate compacts and river
basin commissions, which regulate withdrawals across state lines and are the least understood
instruments in this subject. Each entry states what the instrument actually requires.
Enacted Binding law, regulation or ordinance now in force or with a set effective date.
Proposed Live and undecided: introduced, in committee, or awaiting a council vote.
Vetoed Passed the legislature and was rejected by the governor.
Failed Died in committee, missed a deadline, or was voted down.
No measure located Nothing found at state or local level. Absence of a rule, not absence of data centers.
Not shaded here Federal bills and the three interstate basin bodies span state lines and are listed in the table rather than colored on the map.
Rules that require a water figure to be published, from monthly utility reporting to annual operator filings. The largest group at every level of government.
Local
Fairfax and Prince William Counties, Virginia
Utility metering analyses
Enacted2026
Measured per-building water use in the largest U.S. data center market
Utility-provided analyses report average daily use of roughly 18,000 to 38,000 gallons per day per building, with peak-day demand approaching 88,000 gallons per day, and substantial variability among facilities.
Included because it is measurement rather than mandate, and because it is the best available counterweight to the widely circulated claim that a typical data center consumes millions of gallons a day. Prince William County alone has more than 2,000 acres proposed for 37 data centers totalling 22 to 23 million square feet.
Center for Secure Water, University of Illinois
State
Louisiana
Groundwater registration
EnactedIn force
Registration threshold at 50,000 gallons per day
Registration is required only for groundwater use exceeding 50,000 gallons per day.
Included as a floor case. A facility below the threshold, or one drawing from a public water system rather than its own wells, generates no state record at all.
E&E News
Local
Newton County, Georgia
Water system stress after Meta buildout
Enacted2025 to 2026
The most documented local water case in the country
Reported effects rather than a rule. Residents reported dry taps, sediment and damaged appliances following construction of Meta's data center. County water rates are set to rise 33% from 2025 to 2027 against a usual 2% annual increase, and a 2025 report warns the county is on track for a water deficit by 2030.
Meta's facility is reported to consume about 500,000 gallons per day, roughly 10% of the county's total water use. The case became national when a member of Congress displayed a jar of discolored water from near the site at an EPA hearing. Included because it is the single most cited local water case in the country, and because it is a groundwater and construction-impact story rather than a cooling-volume story. The distinction matters: a closed-loop mandate would not have prevented it.
pressdemocrat.com
State
South Dakota
SB 135
EnactedMar 30, 2026
Data Center Bill of Rights for Citizens
Requires full transparency of data center water usage, requires operators to work with water service providers so that their use is compatible with local supply, and gives counties and municipalities authority to decide whether a data center is welcome.
Signed by Governor Rhoden. The legislature set limits on data centers while rejecting a moratorium. Also requires data centers to cover their own electricity costs.
LegiScan
Regional
Susquehanna River Basin: NY, PA, MD
SRBC consumptive use approval
EnactedIn force
20,000 gallons per day consumptive use threshold
Any data center consumptively using 20,000 gallons per day or more on a 30-day average requires Commission approval, including when the water comes from a public water supply, stormwater, wastewater or recycled sources. These are issued as Approval by Rule type (e), a general permit process in place since 2007.
As of early 2026 the Commission had issued only one permit for a hyperscale data center in the basin, for Amazon Web Services in Salem Township, Pennsylvania. The Commission notes that developers increasingly take water from existing public supplies, which avoids a withdrawal approval because the volume is already counted under the public supplier's own approval. The Commission also approved Constellation Energy withdrawals tied to restarting Three Mile Island to serve data center load.
srbc.gov
Federal
United States
P.L. 119-60 §1531
EnactedDec 18, 2025
National Defense Authorization Act for FY2026
Expands the Department of Defense High Performance Computing Roadmap to estimate the additional electricity and water usage, and the anticipated effects on surrounding communities, from data centers built or expanded on military installations.
The only federal data center water provision enacted to date. It reaches DOD installations only, and the estimates are not required if producing them would delay the roadmap's triennial update.
U.S. Congress
State
Utah
H.B. 76
EnactedEffective May 6, 2026
Data Center Water Transparency Amendments
A large data center, defined as a facility withdrawing 75 acre-feet a year or more across one or more buildings totalling 10,000 square feet or more, must notify its water provider of anticipated water consumption between 90 and 360 days before construction begins, and report to the Division of Water Rights its estimated annual withdrawal, discharge treatment plans, any discharge temperature adjustment and any planned water reuse. Operating facilities report annually by July 1, and the division publishes aggregated, anonymized data by September 1. The state engineer may fine a non-reporting operator up to $100 a day.
Carried by Representative Jill Koford, enacted in the 2026 general session and effective May 6, 2026. It supersedes the 2024 interim draft that used a 50,000 square foot trigger alone, enacts Utah Code 73-5-8.3, and adds a reporting failure to the state engineer enforcement powers in 73-2-25. Individual facility reports are protected records, so what the public sees is a state aggregate rather than a facility figure.
Utah Legislature
State
Virginia
Waterworks regulations
EnactedEffective Jan 1, 2027
Data center water sales reporting category
Waterworks operators must categorize monthly sales reporting data, breaking out usage by data centers holding state air permits separately from domestic, industrial and commercial, and other uncategorized purposes.
A regulation rather than a statute, and the first in the country to make data center water a distinct line in routine utility reporting. It reaches only facilities that already hold a state air permit, so smaller sites remain invisible.
VPM
State
California
AB 1577
Proposed2026 session
Monthly energy and water reporting to the Energy Commission
Monthly reports to the State Energy Commission on energy and water consumption and effectiveness.
The successor vehicle after the AB 93 veto, moving the reporting duty from local water suppliers to a state agency.
MultiState
State
Georgia
SB 421
Proposed2026 session
Ban on local nondisclosure agreements covering water use
Would prohibit local governments from signing nondisclosure agreements with data center operators that conceal energy and water usage information.
Attacks the mechanism rather than the metric. The American Water Works Association has reported that utilities are sometimes barred from releasing consumption data because of these agreements.
MultiState
State
Illinois
POWER Act
ProposedFeb 11, 2026
Water withdrawal and discharge disclosure with IEPA permitting
Would require data centers to disclose total water use including both the amount drawn in and the volume discharged, secure water permits from the Illinois EPA, and meet water efficiency requirements enforced by the agency.
One of the few proposals that asks for the discharge figure as well as the intake figure. The difference between the two is consumption, which is the quantity that actually matters and the one almost no jurisdiction currently collects.
Shaw Local News Network
State
Iowa
HF 2447
Proposed2026 session
Quarterly water use reporting to Iowa DNR
Quarterly water usage reports submitted to the Iowa Department of Natural Resources.
Quarterly cadence is more frequent than most state proposals, which default to annual.
MultiState
State
Michigan
SB 762
Proposed2026 session
Annual utility reporting of data center water use
Annual reports to the Public Service Commission detailing total water used by each data center in a utility's service area.
Places the reporting duty on the utility rather than the operator, which routes around operator nondisclosure agreements.
MultiState
Federal
United States
S. 4784 §1632
ProposedJul 27, 2026
National Defense Authorization Act for FY2027
Broadens the DOD roadmap water estimates to cover data centers supporting military operations and those still to be built or expanded, and raises the update frequency from triennial to annual.
Motion to proceed to consideration made in the Senate July 27, 2026. Amends the FY2026 provision enacted as P.L. 119-60 §1531.
U.S. Congress
Federal
United States
H.R. 9825
ProposedJul 22, 2026
Data Center Water and Energy Transparency Act of 2026
Operators of data centers with peak demand of 25 MW or more would file an annual state report giving total water use and water source for each month, annual average PUE and WUE, and five-year projected water use with reduction proposals.
New or expanded facilities would report five-year projections before operation. Where a state lacks authority to collect the information, reporting runs to DOE and EPA instead. Referred to the House Committee on Energy and Commerce.
U.S. Congress
Federal
United States
S. 4213
ProposedMar 25, 2026
Data Center Water and Energy Transparency Act of 2026
Senate companion to H.R. 9825. Annual state reporting of monthly water use and source, average PUE and WUE, and five-year projections, for operators at 25 MW peak demand or above.
Referred to the Senate Committee on Energy and Natural Resources. Names EPA, DOE and the Department of Agriculture as recipients of operator reports where state authority is absent.
GovTrack
Federal
United States
H.R. 6984
ProposedJan 8, 2026
Data Center Transparency Act
EPA would report to Congress and publish, within six months of enactment and every three months after, the total water consumed by U.S. data centers, how much they reuse, and their effect on local water systems.
The local-effects reporting is unusually specific: potable water availability, whether the facility increased demand on local utilities, service disruptions for other customers, changes in residential water rates, and the type and amount of Clean Water Act pollutants discharged.
U.S. Congress
Federal
United States
S. 3852
ProposedFeb 11, 2026
GRID Act
DOE would set requirements for data centers to publish estimated utility usage, and both operators and utilities would publicly disclose any transaction or agreement between them.
Defines “utility” to include public water systems under the Safe Drinking Water Act and treatment works under the Clean Water Act, which brings water contracts inside the disclosure duty. Aimed at the nondisclosure agreements that keep municipal water deals private.
U.S. Congress
Federal
United States
S. 5054
ProposedJul 21, 2026
Data Center Tax Accountability
Would exempt AI data centers from bonus depreciation and require operators to submit information on electricity and water use.
Referred to the Senate Committee on Finance. Ties the water reporting duty to a tax consequence rather than an environmental permit.
U.S. Congress
State
California
AB 93
VetoedOct 2025
Data center water use reporting to local suppliers
Would have required operators to report estimated water use to the local water supplier before applying for a business license, and to report actual use annually on license renewal.
Authored by Assemblymember Diane Papan. Passed both chambers and was vetoed by Governor Newsom, who objected that rigid reporting requirements could harm the industry.
E&E News
State
New Jersey
S4293
Vetoed2026
Water and energy usage reporting to the Board of Public Utilities
Would have required operators to submit water and energy usage reports, including the source of the water, to the Board of Public Utilities.
Passed both chambers and was vetoed by Governor Murphy, who suggested anonymizing the data, extending the timeline and protecting proprietary information.
E&E News
Rules that specify the architecture rather than the volume, from San Angelo's fill cap and separate meter to South Carolina's proposed zero net withdrawal standard.
Local
Columbia County, Georgia
Google development covenant
EnactedJul 25, 2026
Closed loop required, no wells, water supply protections
Google data centers at White Oak Technology Park between Appling and Harlem must operate as closed-loop systems that recycle cooling water rather than continuously drawing new water. The covenant also bars wells, sets decibel limits and lighting standards, requires minimal footprint and visibility, protects the local water supply, and requires an end-of-useful-life strategy.
Announced as a partnership between Columbia County, Google and Georgia Power, and described by the county as among the most restrictive data center covenants in the country. Google committed to cover 100% of the power costs associated with the development. A negotiated covenant is not an ordinance: it binds this developer at this site.
wrdw.com
State
Oklahoma
SB 259
EnactedApproved May 20, 2026
Groundwater Modernization Act
Data centers are barred from using groundwater in open-air evaporative cooling systems, or in any other system that consumes groundwater through evaporation without recirculation. To obtain a groundwater permit a data center must demonstrate low-consumptive cooling technology such as a closed loop or dielectric immersion system. Water permit holders file annual water use reports with the Oklahoma Water Resources Board, which is directed to write rules for reviewing those reports, investigating waste complaints and penalizing overuse.
Authored by Senator Brent Howard with Representative Carl Newton as principal House author, approved by the Governor on May 20, 2026 and effective November 1, 2026. Oklahoma pairs a cooling technology condition with a reporting duty in a single instrument, which is rarer than either alone. It matters here because the state's largest disclosed data center figures came from utility billing records rather than state permits: Oklahoma data centers have generally needed no state water permit at all.
okhouse.gov
Local
San Angelo, Texas
Data center water ordinance
EnactedJun 16, 2026
Closed-loop mandate with a per-square-foot fill cap
Requires any data center to use a closed-loop cooling system, limits the initial water fill to no more than 8 gallons per square foot of gross building area, requires cooling water to be metered separately from other water use, and requires any approved or emergency exceedance to be reported in writing to the City Council within five business days.
The most precisely drafted local water ordinance located to date. It regulates the three things that actually determine outcomes: the architecture, the fill volume, and the meter. Most ordinances regulate only the first.
San Angelo LIVE
Local
Tucson, Arizona
Large-scale data center standards
EnactedAug 6, 2026
No potable water for cooling, plus large-volume user compliance
Adopted 6-1. Applicants using Tucson Water must comply with the Large Quantity Water User Ordinance and demonstrate adequate water supply; applicants not covered by that ordinance may use no potable water for cooling. Council Member Schubert's amendments add one-year and two-year reviews of the ordinance.
Passed after the Council had already denied city water service to the Project Blue campus. Bobcat Tucson Water LLC subsequently applied for two commercial wells on Project Blue's behalf, approved under three existing legal groundwater rights agreements, which is how a municipal water denial gets routed around.
news.azpm.org
Local
Fort Worth, Texas
Data center zoning ordinance
ProposedJul 8, 2026
Proposed closed-loop cooling requirement
Would require data centers to be equipped with closed-loop cooling systems that recycle water and reduce evaporative loss, as part of a first-of-its-kind zoning and development ordinance for the city.
The Zoning Commission voted 7-4 to deny the ordinance on July 8, 2026, sending it to the City Council without a favorable recommendation.
Fort Worth Report
State
Kansas
SB 400
Proposed2026 session
Closed-loop cooling requirement with private right of action
Would require closed-loop cooling systems and allow municipalities and the attorney general to sue for violations.
The enforcement design is the notable part. Most disclosure bills create a filing duty with no obvious remedy; this one creates standing.
MultiState
State
Ohio
Data center cooling and tariff legislation
Proposed2026 session
Cooling, rate-class and tariff requirements
Would impose new cooling requirements, a separate rate class, and tariff conditions on data centers.
Not a moratorium. Ohio is pursuing the utility-regulation route rather than the siting route, which reaches existing facilities as well as new ones.
bondbuyer.com
State
South Carolina
HB 4583
Proposed2026 session
Zero net withdrawal closed-loop mandate
Would require closed-loop systems achieving zero net water withdrawal and net zero wastewater discharge, and prohibit extraction of groundwater and municipal water for cooling.
Gaining bipartisan co-sponsors. The strictest state-level architecture mandate introduced so far: it does not set a performance threshold, it removes the water source.
MultiState
Rules that decide where a facility may draw from, including per-square-foot caps, large-volume user ordinances and the interstate basin thresholds.
Local
Chandler, Arizona
2015 water-intensive business ordinance
Enacted2015
115 gallons per day per 1,000 square feet
Restricts new water-intensive businesses from developing unless they align with the city's economic development plan, and limits data centers to 115 gallons per day per 1,000 square feet of space.
The first municipal data center water regulation in Arizona, and the oldest instrument in this tracker. It was written after the city discovered in 2013 how much water an existing data center was using, when the operator began requesting additional water connections.
Phoenix New Times
Local
Coweta County, Georgia
Data Center Ordinance
EnactedDec 2025
Industrial zoning with utility capacity requirements
Permits data centers in light industrial and industrial districts subject to requirements on location, buffering, design standards, noise, lighting, traffic and utility capacity.
In January 2026 Atlas Development amended its application seeking a more intensive industrial classification, and residents filed an appeal to stop the project on protected rural land.
CBS News
Regional
Great Lakes Basin: IL, IN, MI, MN, NY, OH, PA, WI plus Ontario and Quebec
Great Lakes Compact, 2008
EnactedIn force since 2008
Diversions outside the basin prohibited
Prohibits diversions of Great Lakes water outside the basin and requires that withdrawals within the basin be managed consistently with conservation and the long-term integrity of the resource.
Only one diversion application has ever been approved, for the City of Waukesha, Wisconsin. The eight Great Lakes states have become one of the country's data center epicenters, with more than 220 facilities still planned across the region, and the compact governs the water without governing the siting.
greatlakes.org
Local
Mesa, Avondale and Phoenix, Arizona
Large-volume water user ordinances
EnactedIn force
Industrial usage caps with supplemental supply purchase
Water utilities for Mesa, Avondale and the City of Phoenix have each adopted ordinances capping usage for industrial facilities and requiring developers to purchase supplemental water supplies if they wish to exceed those caps.
A market mechanism rather than a prohibition: exceeding the cap is permitted, but the developer must bring new supply rather than draw down the existing one. Cataloged in the ASU Morrison Institute survey of Arizona large-volume water user ordinances.
ASU Morrison Institute
State
Michigan
Data center tax exemption law
EnactedIn force
Municipal water capacity condition on tax breaks
Data centers receiving the state tax exemption may use municipal water only from a system with available capacity.
A capacity test rather than a volume cap, and it binds only facilities taking the tax break. Michigan sits inside the Great Lakes Compact, so a facility that self-sources faces the basin rules instead.
circleofblue.org
State
Ohio
Lake Erie watershed rule
EnactedIn force
Consumptive-use permit above 1 million gallons per day
In the Lake Erie watershed, any facility proposing new or increased withdrawals above 1 million gallons per day must obtain a consumptive-use permit and demonstrate no significant adverse impact.
Pre-existing water law rather than a data center measure, but it is the binding constraint on large facilities in northern Ohio and it applies without any new legislation.
Control Associates
Local
Salt Lake City, Utah
Large water user ordinance
Enacted2022
Industries above 200,000 gallons per day barred
Adopted an ordinance barring industries that use more than 200,000 gallons of water a day.
Predates the AI buildout and was not written for data centers, but it is one of the few municipal instruments that sets a hard daily volume ceiling rather than a review trigger.
grist.org
Local
Austin, Texas
Large-load data center resolution
ProposedAug 26, 2026
Zoning and water requirements written before the first hyperscale site
A City Council resolution, set for debate and a vote on August 27, 2026, directs work on a definition for high-impact data centers and a review process that would require developers to seek additional city approval. Planning staff also recommend new requirements covering water use, noise, heat and lighting, and a statement in the city's economic development policy that Austin will not incentivize data center construction.
Austin has no land use classification for data centers, which leaves the city little authority over one that is proposed. Austin Energy serves 10 data centers drawing between 1 and 20 megawatts, and no hyperscale facility has been proposed inside city limits. Five council members are pursuing the package and one has said she would support a construction moratorium until the rules are settled. Sponsors cite the low response rate to the state water survey as the reason to legislate locally.
texastribune.org
Local
Colleton County, South Carolina
Gigawatt campus application
Proposed2026
First proposed gigawatt campus in the state
An 860-acre, approximately $6 billion campus proposed for the Lowcountry would be South Carolina's first gigawatt-scale data center. Residents and elected officials packed a county civic center meeting to oppose it.
Tracked as a live siting decision. South Carolina is simultaneously considering HB 4583, which would require zero net water withdrawal statewide.
yahoo.com
Local
Festus, Missouri
Draft water-use limits
Proposed2026
Water limits for any new industry, including data centers
A city council member is drafting ordinances that would set limits on water use for any new industry, including data centers.
Drafted after a data center vote in which four council members were subsequently voted out. Notable for regulating by water volume across all industry rather than singling out one sector, which is the objection the Data Center Coalition raises against sector-specific mandates.
Brockovich AI Data Center Reporting
Local
Lopatcong Township, New Jersey
Planning Board recommendations
Proposed2026
Data center rules referred to Town Council
The Planning Board referred a set of recommendations on data center rules to the Town Council for adoption.
Included as an example of the planning-board referral stage, where most local water conditions are first drafted.
TAPinto
Local
Newton County, Georgia
Unified Development Ordinance revision
Proposed2026 draft
Technology Campus district covering water resources
Would create a Technology Campus zoning district for data centers, require a minimum of 300 acres in TC or heavy industrial M2 districts, and require a conditional-use permit in either classification. The broader ordinance revision covers zoning, development regulations and water resources.
Applies to unincorporated Newton County. Part of the wave of Georgia county ordinances adopted since late 2025.
The Covington News
State
Texas
Blanco-Pedernales GCD resolution
ProposedApr 16, 2026
Groundwater district request for authority to deny data center permits
The Blanco-Pedernales Groundwater Conservation District passed a resolution urging the Texas Legislature to grant it the legal authority to deny water permits to data centers.
Groundwater conservation districts are the primary local groundwater regulators in Texas, and this one is saying its existing authority is not sufficient to refuse a large industrial permit.
The Texas Dispatch
Federal
United States
H.R. 9777
ProposedJul 20, 2026
Protecting Ratepayers Act
Would bar any private entity from building, owning or operating a new or existing data center unless all of its water, including backup water, comes from an on-site source or some other source separate from the public water system.
The most restrictive water instrument introduced at any level of government. Against the CRS finding that public water systems supply an estimated 97% of U.S. data center water, this would require the sector to re-source essentially all of its supply.
U.S. Congress
Federal
United States
H.R. 9497
ProposedJul 2026
Water Resources Development Act of 2026
As ordered to be reported in July 2026, would amend U.S. Army Corps of Engineers water supply authority, which governs whether federal reservoir storage can be made available to users including data centers.
Federal reservoirs reach data centers mostly indirectly, through public water systems or communities holding agreements with the Corps or the Bureau of Reclamation.
U.S. Congress
State
Virginia
HB 1601
Vetoed2025 session
Local authority over water resource impact assessments
Would have required assessment of noise impacts and authorized local governments to require water resource impact assessments for data center projects.
Sponsored by Delegate Josh Thomas. Passed the legislature and was vetoed by Governor Youngkin, who described it as creating unnecessary obstacles to data center development.
E&E News
Full or temporary halts, from New York's first-in-the-nation statewide moratorium to county pauses written to buy time for zoning.
Local
Imperial County, California
Data center development freeze
EnactedJun 2026
Freeze running to June 2027 after a Colorado River water denial
The Board of Supervisors reversed an earlier project approval and adopted a 45-day freeze on data center development, later extended to roughly 10.5 months and running until June 2027.
The freeze followed the Imperial Irrigation District's May 1, 2026 denial of a complete water application filed on April 22 by Imperial Valley Computer Manufacturing LLC. The developer petitioned the Superior Court against the district on June 5 and announced an intent to seek a restraining order against the freeze on June 23, with two hearings held in late July 2026. The cities of Imperial and El Centro had each withdrawn from recycled water agreements for the project in late 2025. It is the clearest case in the tracker of a water agency decision, not a zoning decision, stopping a project.
western-water.com
Local
Indianapolis and Marion County, Indiana
Construction bar through 2027
EnactedAug 10, 2026
County-wide pause on new data center construction
The City-County Council voted 23-1 to bar new data center construction in Marion County through the end of 2027.
Statewide context: Indiana has 11 counties with data center ordinances, at least 17 with temporary moratoria, and two, Marshall and Cass, that have banned new data centers outright.
WFYI
State
New York
Executive Order
EnactedJul 2026
First statewide moratorium on new hyperscale data centers
Bars construction of new hyperscale data centers drawing 50 MW or more, and directs a statewide environmental review that must examine energy use, water consumption, land use, pollution and impacts on disadvantaged communities.
The first statewide data center moratorium in the country. The enabling bill cleared the Senate 43-17 and the Assembly 103-38 on June 4, 2026. Water consumption is named in the review scope, which makes this the largest single water study ordered by any state.
governor.ny.gov
Local
Reno, Nevada
Application pause
EnactedMay 2026
Temporary pause on new data center applications
The Reno City Council placed a temporary pause on new data center applications.
Adopted weeks before the Nye County water board sought its own moratorium, in a state where a large share of capacity sits in high or extremely high water stress areas.
nevadacurrent.com
Local
Apex, North Carolina
Proposed one-year moratorium
Proposed2026
Moratorium following a withdrawn campus application
Moved toward a one-year moratorium on data centers after the proposed New Hill Digital Campus was withdrawn.
The pattern local governments are converging on: use a temporary pause to buy time to write zoning and water rules, rather than fight each application on its own terms.
wral.com
Local
North Mankato, Minnesota
Proposed moratorium
ProposedJul 2026
Moratorium triggered by water volume
Would impose a moratorium on large data centers over 150,000 square feet or using more than 50,000 gallons of water daily, pending further public input and a council vote.
One of the few local pauses that names a water volume as the trigger rather than acreage, megawatts or zoning district alone.
WFYI
Local
Nye County, Nevada
Water District emergency order
ProposedMay 27, 2026
Emergency order seeking a Pahrump Valley moratorium
The Nye County Water District Governing Board unanimously approved an emergency order requesting that the County Commission place a moratorium on data centers in the Pahrump Valley.
A water authority asking a land use authority to stop approvals. The split between who controls water and who controls zoning is the recurring structural problem in this tracker.
nevadacurrent.com
Federal
United States
H.R. 9442
ProposedJun 24, 2026
Artificial Intelligence Data Center Moratorium Act
A moratorium on construction of new data centers until safeguarding legislation is enacted, with DOE filing quarterly reports on AI data center water usage, wastewater discharge and thermal outputs.
Referred to House Energy and Commerce and House Foreign Affairs. Senate companion is S. 4214.
U.S. Congress
Federal
United States
S. 4214
ProposedMar 25, 2026
Artificial Intelligence Data Center Moratorium Act
Senate companion to H.R. 9442. Construction moratorium pending safeguarding legislation, with quarterly DOE reporting on AI data center water usage, wastewater discharge and thermal output.
Referred to the Senate Committee on Commerce, Science, and Transportation.
U.S. Congress
State
Wisconsin
Draft moratorium package
Proposed2026 session
Statewide moratorium conditioned on a protections package
Circulated draft legislation would prohibit data center operation until the legislature enacts a package of protections, including a statewide planning authority and explicit bans on shifting data center energy and water costs onto residential customers.
Four earlier bills regulating data centers failed before lawmakers ended the general business session for the year. The explicit ban on shifting water costs to households is unusual: most bills address electricity rates only.
bondbuyer.com
State
Maine
2026 moratorium bill
VetoedApr 2026
Statewide data center moratorium
Would have imposed a statewide moratorium on new data center construction.
Passed the legislature in April 2026 and was vetoed by Governor Janet Mills, who cited a proposed data center at a former paper mill site in a town that had struggled since the mill closed. Maine came closer than any state to the first statewide ban before New York enacted one.
yahoo.com
Rules that move the draw off the drinking water system without reducing the gallons.
State
Florida
CS/CS/SB 484
EnactedMay 7, 2026
Florida Hyperscale Data Center Act
Requires data centers to use reclaimed water where it is environmentally, economically and technically feasible; creates a permitting framework to protect aquifers and local water supplies; classifies facilities at 50 MW peak demand or above as large-scale; and preserves local authority to deny projects or impose stricter standards.
Signed by Governor DeSantis on May 7, 2026, effective July 1, 2026. Also bars utilities from passing data center costs to residential and small-business ratepayers. The feasibility qualifier is the operative question: the statute does not say who decides what is feasible.
Florida Senate
Local
Memphis, Tennessee
Colossus Water Recycling Facility
Proposed2026
Operator-funded greywater plant in place of aquifer withdrawal
An approximately $80 million wastewater recycling facility, a collaboration between xAI, the Tennessee Valley Authority and Nucor Steel, designed to process up to 13 million gallons of wastewater daily and to eliminate the need to draw from the Memphis Aquifer, with a stated goal of reducing aquifer strain by 9%.
Reported as awaiting permits and funding, with the Tennessee Department of Environment and Conservation stating it had not received a permit application for the facility and that preliminary schematics are not subject to its review. Included as a tracked commitment, not a completed mitigation.
Local 24 Memphis
State
Virginia
SB 417
Failed2026 session
Treated wastewater condition on state grant funding
Would have conditioned state grant funding for data centers on the use of treated wastewater in cooling systems.
Did not pass before the crossover deadline; expected to be reconsidered in 2027.
MultiState
Credits, exemptions and grant conditions used to pull facilities toward reuse.
Federal
United States
H.R. 2940
ProposedApr 17, 2025
Advancing Water Reuse Act
A 30% investment tax credit for qualifying water reuse projects, defined to include installing, replacing or modifying an on-site water recycling system within a data center.
Referred to House Ways and Means. The same 30% credit reappears in H.R. 6900 and in §201 of H.R. 9419.
U.S. Congress
Federal
United States
H.R. 9419 §201
ProposedJun 24, 2026
Power and Water for Families Act of 2026
A 30% investment credit for qualifying water reuse projects, extended to cover replacing freshwater such as groundwater with recycled municipal water, and building or expanding municipal recycling systems to secure that supply.
The broadest of the three water-reuse credit vehicles: it reaches the municipal recycling infrastructure, not only equipment inside the fence line. Also aims to protect existing ratepayers from incremental infrastructure costs attributable to large-load facilities.
U.S. Congress
Federal
United States
H.R. 6900 §24001
ProposedDec 18, 2025
American Cost-of-Living legislation (water reuse credit)
Authorizes a 30% tax credit for qualifying water reuse projects, including on-site water recycling systems within data centers.
Referred to House Ways and Means and House Energy and Commerce. Companion language to H.R. 2940.
U.S. Congress
Federal
United States
S. 3737
ProposedMar 17, 2026
GROW SMART Act
Amends the Reclamation States Emergency Drought Relief Act of 1991 to fund voluntary water partnership agreements, and names data centers among the industrial and commercial entities eligible to be qualified applicants alongside irrigation districts.
Committee hearings held March 17, 2026 before Senate Energy and Natural Resources. Would put data centers and agricultural water users inside the same Bureau of Reclamation transaction framework rather than in competition for the same supply.
U.S. Congress
State
Virginia
SB 30 / HB 30
Proposed2026 session
Budget amendments conditioning data center tax treatment
Would condition the data center tax credit on investments in environmental management. The House version would eliminate the sales tax exemption.
Budget vehicles rather than standalone environmental bills, which makes them harder to veto in isolation.
MultiState
Instruments that commission an answer rather than impose a rule.
Regional
Potomac River Basin: MD, VA, WV, PA, DC
ICPRB data center water analysis
Enacted2026
Basin-scale assessment of data center demand
The Interstate Commission on the Potomac River Basin maintains an assessment of data center water use in the basin that supplies the Washington region.
Regional load forecasts underlying the work project a 35% increase for the Allegheny Power service area covering Maryland, West Virginia and Pennsylvania, and a 135% increase for Dominion's Virginia territory, with data centers named as the primary driver. The Commission held a joint public webinar on data centers with the Susquehanna and Delaware river basin commissions.
potomacriver.org
State
Virginia
Eastern Virginia groundwater study
EnactedJul 28, 2026
State study urging authority to reject industrial withdrawal permits
The long-delayed state groundwater study found declines are likely in a critical eastern Virginia aquifer from population growth and industrial use, and recommended that regulators be given more authority to reject industrial water withdrawal permits, to require applicants to examine alternative water sources, and to act against users drawing more than they should.
Published in the largest data center market in the world. The recommendations are not yet law; they set the agenda for the next Virginia session.
VPM
State
Texas
2026 interim charges
ProposedJun 24, 2026
Legislative review of data center water demand
House Speaker Burrows and Lieutenant Governor Patrick placed data center water demand in the 2026 interim charges for five legislative panels, including House Natural Resources and the Senate Committee on Water, Agriculture and Rural Affairs, to draft recommendations ahead of the 90th Legislature.
The Texas Water Development Board has acknowledged it has no way to track groundwater pumping by data centers in counties without a groundwater conservation district, which is the case in more than half of Texas counties.
KWTX
Federal
United States
H.R. 9372
ProposedJun 25, 2026
Data Infrastructure Energy Measurement and Standards Act
NIST, with DOE, would run a measurement research program to develop best practices, definitions, methodologies and technical standards for measuring water use by data centers, including water use from AI training and inference.
Ordered to be reported in the nature of a substitute (amended) by the House Committee on Science, Space, and Technology. The furthest-advanced federal bill of the set, and the one that addresses the measurement gap directly rather than legislating around it.
U.S. Congress
Federal
United States
H.R. 8033 §5
ProposedMar 20, 2026
No Harm Data Centers Act
Directs EPA to seek an agreement with the National Academies to assess data center impacts on the environment and public health, including water consumption and water supply, and to recommend mitigations.
Referred to House Energy and Commerce. Section 2 of H.R. 9629 carries the same National Academies assignment.
U.S. Congress
Federal
United States
H.R. 9629 §2
ProposedJul 9, 2026
Protecting Communities from Data Center Impacts Act of 2026
EPA would seek an agreement with the National Academies for an assessment of data center impacts on the environment and public health, including water consumption and water supply.
Referred to House Energy and Commerce. Duplicates §5 of H.R. 8033 as a standalone vehicle.
U.S. Congress
Federal
United States
H.R. 7858 §3
ProposedMar 5, 2026
Data Center Community Impact Act
DOE, with EPA, Commerce, FERC and CEQ, would study data center effects on communities of color and low-income communities, including water consumed, effects on local supplies and drought-prone regions, and how cooling processes affect wastewater systems.
Referred to House Energy and Commerce. The only federal bill in the set that pairs the water question with a distributional one.
U.S. Congress
Federal
United States
S. 3269 §2
ProposedApr 15, 2026
Liquid Cooling for AI Act of 2025
GAO technology assessment of liquid cooling for AI compute clusters, evaluating coolant options including water, water-glycol and engineered fluids, plus materials compatibility, corrosion control, biological growth mitigation, filtration and fluid management.
Referred to Senate Energy and Natural Resources. Section 3 of H.R. 5332 requires a similar but narrower GAO review.
U.S. Congress
Federal
United States
H.R. 5332 §3
Proposed2026
Liquid Cooling for AI Act of 2026
GAO technology assessment focused on liquid cooling systems for AI compute clusters and high-performance computing facilities.
Referred to House Science, Space, and Technology and House Energy and Commerce. House counterpart to S. 3269.
U.S. Congress
Federal
United States
H.R. 5227
Proposed2026
Unleashing Low-Cost Rural AI
A DOE study of the impact of artificial intelligence and data center site growth on U.S. energy supply resources.
Referred to House Science, Space, and Technology. Water enters through the energy-supply analysis rather than as a direct subject.
U.S. Congress
How a large water user is billed, and who absorbs the cost of new capacity.
State
Iowa
HF 2261
Failed2026 session
Separate water customer class for large loads
Would have required water utilities serving facilities that need 20 MW of power or more to create a separate customer class with distinct rates.
Reported as unlikely to advance. Notable for defining a water customer class by electrical demand rather than water volume.
MultiState
The counterweight: instruments that insulate a data center permit from challenge.
State
Texas
Government Code 552.1331 (H.B. 872, 87th Legislature)
EnactedEffective Sep 1, 2021
Smart meter records exception used to withhold data center water use
Information a government-operated utility collects through an advanced metering system for usage, services and billing is excepted from disclosure under the Public Information Act. The utility must release the data to the customer it belongs to, and to nobody else.
Written to keep household smart meter readings away from payday lenders, not to cover industrial customers. San Antonio Water System invoked it in 2026 to deny a records request for three years of water use at 36 area data centers. The bill's author, Representative Diego Bernal, said the utility is not applying the law as he intended. This provision is the counterweight sitting underneath every Texas disclosure proposal on this page: a state can require reporting and still have the resulting numbers withheld.
ksat.com
Federal
United States
H.R. 8037
ProposedMar 24, 2026
Protect American AI Act of 2026
A civil action over an environmental review under the Clean Water Act would not affect the validity of a permit issued for a data center. A court finding a violation would remand to the agency rather than vacate, and the agency would keep processing applications.
The counterweight to every disclosure bill in this table: it moves in the opposite direction, insulating data center water permits from judicial vacatur. Referred to House Energy and Commerce and House Judiciary.
U.S. Congress
No measure matches those filters.
Federal water regulation
Twenty-three bills, one law
Congress has generally deferred to state primacy over intrastate water allocation, which is why the binding rules in this subject are written in state capitols and city halls. That has not stopped Congress from filing bills. Twenty-three measures in the 119th Congress touch data center water, and exactly one has become law: a provision of the FY2026 defense authorization that requires the Defense Department to estimate water use for data centers on military installations. Everything else below sits in committee. The groups are ordered by what each would actually do.
Figure 4
Counted from this tracker’s own dataset, by the date each measure was introduced, adopted or vetoed. The forward-dated bar is Virginia’s waterworks reporting rule, which takes effect in January 2027.
One federal water provision has been enacted. It reaches data centers on military installations and nowhere else.
P.L. 119-60 §1531EnactedDec 18, 2025
National Defense Authorization Act for FY2026
Expands the Department of Defense High Performance Computing Roadmap to estimate the additional electricity and water usage, and the anticipated effects on surrounding communities, from data centers built or expanded on military installations.
The only federal data center water provision enacted to date. It reaches DOD installations only, and the estimates are not required if producing them would delay the roadmap's triennial update.
U.S. Congress
The largest group. Every one of these would require operators, utilities or agencies to publish water figures that are not collected today. None has passed.
S. 4784 §1632ProposedJul 27, 2026
National Defense Authorization Act for FY2027
Broadens the DOD roadmap water estimates to cover data centers supporting military operations and those still to be built or expanded, and raises the update frequency from triennial to annual.
Motion to proceed to consideration made in the Senate July 27, 2026. Amends the FY2026 provision enacted as P.L. 119-60 §1531.
U.S. Congress
H.R. 9825ProposedJul 22, 2026
Data Center Water and Energy Transparency Act of 2026
Operators of data centers with peak demand of 25 MW or more would file an annual state report giving total water use and water source for each month, annual average PUE and WUE, and five-year projected water use with reduction proposals.
New or expanded facilities would report five-year projections before operation. Where a state lacks authority to collect the information, reporting runs to DOE and EPA instead. Referred to the House Committee on Energy and Commerce.
U.S. Congress
S. 4213ProposedMar 25, 2026
Data Center Water and Energy Transparency Act of 2026
Senate companion to H.R. 9825. Annual state reporting of monthly water use and source, average PUE and WUE, and five-year projections, for operators at 25 MW peak demand or above.
Referred to the Senate Committee on Energy and Natural Resources. Names EPA, DOE and the Department of Agriculture as recipients of operator reports where state authority is absent.
GovTrack
H.R. 6984ProposedJan 8, 2026
Data Center Transparency Act
EPA would report to Congress and publish, within six months of enactment and every three months after, the total water consumed by U.S. data centers, how much they reuse, and their effect on local water systems.
The local-effects reporting is unusually specific: potable water availability, whether the facility increased demand on local utilities, service disruptions for other customers, changes in residential water rates, and the type and amount of Clean Water Act pollutants discharged.
U.S. Congress
S. 3852ProposedFeb 11, 2026
GRID Act
DOE would set requirements for data centers to publish estimated utility usage, and both operators and utilities would publicly disclose any transaction or agreement between them.
Defines “utility” to include public water systems under the Safe Drinking Water Act and treatment works under the Clean Water Act, which brings water contracts inside the disclosure duty. Aimed at the nondisclosure agreements that keep municipal water deals private.
U.S. Congress
S. 5054ProposedJul 21, 2026
Data Center Tax Accountability
Would exempt AI data centers from bonus depreciation and require operators to submit information on electricity and water use.
Referred to the Senate Committee on Finance. Ties the water reporting duty to a tax consequence rather than an environmental permit.
U.S. Congress
Three separate vehicles carry the same 30% investment credit for on-site water recycling, and one extends it to the municipal recycling systems that supply it.
H.R. 2940ProposedApr 17, 2025
Advancing Water Reuse Act
A 30% investment tax credit for qualifying water reuse projects, defined to include installing, replacing or modifying an on-site water recycling system within a data center.
Referred to House Ways and Means. The same 30% credit reappears in H.R. 6900 and in §201 of H.R. 9419.
U.S. Congress
H.R. 9419 §201ProposedJun 24, 2026
Power and Water for Families Act of 2026
A 30% investment credit for qualifying water reuse projects, extended to cover replacing freshwater such as groundwater with recycled municipal water, and building or expanding municipal recycling systems to secure that supply.
The broadest of the three water-reuse credit vehicles: it reaches the municipal recycling infrastructure, not only equipment inside the fence line. Also aims to protect existing ratepayers from incremental infrastructure costs attributable to large-load facilities.
U.S. Congress
H.R. 6900 §24001ProposedDec 18, 2025
American Cost-of-Living legislation (water reuse credit)
Authorizes a 30% tax credit for qualifying water reuse projects, including on-site water recycling systems within data centers.
Referred to House Ways and Means and House Energy and Commerce. Companion language to H.R. 2940.
U.S. Congress
S. 3737ProposedMar 17, 2026
GROW SMART Act
Amends the Reclamation States Emergency Drought Relief Act of 1991 to fund voluntary water partnership agreements, and names data centers among the industrial and commercial entities eligible to be qualified applicants alongside irrigation districts.
Committee hearings held March 17, 2026 before Senate Energy and Natural Resources. Would put data centers and agricultural water users inside the same Bureau of Reclamation transaction framework rather than in competition for the same supply.
U.S. Congress
Two companion bills would halt new data center construction pending safeguards, with quarterly federal reporting on water use, wastewater discharge and thermal output.
H.R. 9442ProposedJun 24, 2026
Artificial Intelligence Data Center Moratorium Act
A moratorium on construction of new data centers until safeguarding legislation is enacted, with DOE filing quarterly reports on AI data center water usage, wastewater discharge and thermal outputs.
Referred to House Energy and Commerce and House Foreign Affairs. Senate companion is S. 4214.
U.S. Congress
S. 4214ProposedMar 25, 2026
Artificial Intelligence Data Center Moratorium Act
Senate companion to H.R. 9442. Construction moratorium pending safeguarding legislation, with quarterly DOE reporting on AI data center water usage, wastewater discharge and thermal output.
Referred to the Senate Committee on Commerce, Science, and Transportation.
U.S. Congress
Measurement bills. One would have NIST build the standards for measuring data center water at all, which is the gap underneath every other bill in this section.
H.R. 9372ProposedJun 25, 2026
Data Infrastructure Energy Measurement and Standards Act
NIST, with DOE, would run a measurement research program to develop best practices, definitions, methodologies and technical standards for measuring water use by data centers, including water use from AI training and inference.
Ordered to be reported in the nature of a substitute (amended) by the House Committee on Science, Space, and Technology. The furthest-advanced federal bill of the set, and the one that addresses the measurement gap directly rather than legislating around it.
U.S. Congress
H.R. 8033 §5ProposedMar 20, 2026
No Harm Data Centers Act
Directs EPA to seek an agreement with the National Academies to assess data center impacts on the environment and public health, including water consumption and water supply, and to recommend mitigations.
Referred to House Energy and Commerce. Section 2 of H.R. 9629 carries the same National Academies assignment.
U.S. Congress
H.R. 9629 §2ProposedJul 9, 2026
Protecting Communities from Data Center Impacts Act of 2026
EPA would seek an agreement with the National Academies for an assessment of data center impacts on the environment and public health, including water consumption and water supply.
Referred to House Energy and Commerce. Duplicates §5 of H.R. 8033 as a standalone vehicle.
U.S. Congress
H.R. 7858 §3ProposedMar 5, 2026
Data Center Community Impact Act
DOE, with EPA, Commerce, FERC and CEQ, would study data center effects on communities of color and low-income communities, including water consumed, effects on local supplies and drought-prone regions, and how cooling processes affect wastewater systems.
Referred to House Energy and Commerce. The only federal bill in the set that pairs the water question with a distributional one.
U.S. Congress
S. 3269 §2ProposedApr 15, 2026
Liquid Cooling for AI Act of 2025
GAO technology assessment of liquid cooling for AI compute clusters, evaluating coolant options including water, water-glycol and engineered fluids, plus materials compatibility, corrosion control, biological growth mitigation, filtration and fluid management.
Referred to Senate Energy and Natural Resources. Section 3 of H.R. 5332 requires a similar but narrower GAO review.
U.S. Congress
H.R. 5332 §3Proposed2026
Liquid Cooling for AI Act of 2026
GAO technology assessment focused on liquid cooling systems for AI compute clusters and high-performance computing facilities.
Referred to House Science, Space, and Technology and House Energy and Commerce. House counterpart to S. 3269.
U.S. Congress
H.R. 5227Proposed2026
Unleashing Low-Cost Rural AI
A DOE study of the impact of artificial intelligence and data center site growth on U.S. energy supply resources.
Referred to House Science, Space, and Technology. Water enters through the energy-supply analysis rather than as a direct subject.
U.S. Congress
The counterweight to everything above. It moves in the opposite direction, keeping a Clean Water Act challenge from voiding a data center permit.
H.R. 8037ProposedMar 24, 2026
Protect American AI Act of 2026
A civil action over an environmental review under the Clean Water Act would not affect the validity of a permit issued for a data center. A court finding a violation would remand to the agency rather than vacate, and the agency would keep processing applications.
The counterweight to every disclosure bill in this table: it moves in the opposite direction, insulating data center water permits from judicial vacatur. Referred to House Energy and Commerce and House Judiciary.
U.S. Congress
Instruments that alter where the water comes from rather than how it is reported, from barring public water system supply outright to opening federal reservoir storage.
H.R. 9777ProposedJul 20, 2026
Protecting Ratepayers Act
Would bar any private entity from building, owning or operating a new or existing data center unless all of its water, including backup water, comes from an on-site source or some other source separate from the public water system.
The most restrictive water instrument introduced at any level of government. Against the CRS finding that public water systems supply an estimated 97% of U.S. data center water, this would require the sector to re-source essentially all of its supply.
U.S. Congress
H.R. 9497ProposedJul 2026
Water Resources Development Act of 2026
As ordered to be reported in July 2026, would amend U.S. Army Corps of Engineers water supply authority, which governs whether federal reservoir storage can be made available to users including data centers.
Federal reservoirs reach data centers mostly indirectly, through public water systems or communities holding agreements with the Corps or the Bureau of Reclamation.
U.S. Congress
No federal bill matches that search.
The ledger
Every water use, with the basis stated
Withdrawal, consumption and application are three different quantities. Most of
the arguing in this subject comes from comparing one to another. Each row below states its
basis and its year. Rows are comparable only within the same basis and the same scope, and
the column does not sum.
U.S. data centers: direct cooling17.4 billion gal
reference
Consumption2023Lawrence Berkeley National Laboratory
Up from 5.6 billion gallons in 2014. Direct use only: water consumed at the facility for thermal regulation, excluding off-site power generation and hardware manufacture.
U.S. data centers: indirect, at the power plant211 billion gal
12× data center cooling
Consumption2023Information Technology and Innovation Foundation
Roughly twelve times the direct figure. This is water consumed generating the electricity the facilities run on, and it moves with the generation mix, not with the cooling system.
U.S. golf course irrigation~531 billion gal
31× data center cooling
Applied2024Golf Course Superintendents Association of America
Roughly 1.63 million acre-feet applied across U.S. golf facilities, about 1.5 billion gallons a day. Down about 31% since 2005, roughly two-thirds of the drop from more efficient irrigation, drought-tolerant grasses and smaller irrigated footprints.
California almonds1.53–1.79 trillion gal
88× data center cooling
Applied2024California Water Impact Network
Between 4.7 and 5.5 million acre-feet a year depending on water availability and bearing acreage. Other analyses using California Department of Water Resources crop data put almonds and pistachios together at about 2.1 million acre-feet, or roughly 9% of the state's agricultural water. The two figures rest on different methods and should not be reconciled by splitting the difference.
Total U.S. freshwater withdrawals~322 billion gal/day
different basis and time unit
Withdrawal2020U.S. Congress
The denominator. Withdrawal, not consumption: most of this volume is returned to its source. Data center direct consumption is estimated at approximately 2% of total U.S. water consumption.
Every state's own ledger sits in its file above.
Architecture
What actually changes the number
Every projection in this subject is a bet on cooling architecture. The Houston
Advanced Research Center's 2030 range for Texas runs from 29 to 161 billion gallons, and the
variable that decides where it lands is which of the systems below gets built.
Figure 2
The same withdrawal produces wildly different consumption depending on how heat leaves the building. One operator’s air-cooled Texas facility used 10,000 gallons across all of 2024, while the same operator’s older Iowa facility used 1.3 billion gallons in the same year. This is why the Houston Advanced Research Center’s 2030 range for Texas runs from 29 to 161 billion gallons: the spread is a bet on which of these gets built.
Open-loop evaporative cooling
Legacy
Water use effectiveness~1.8 L/kWh
The industry-average baseline and the architecture behind almost every alarming projection. Between 70% and 80% of withdrawn water is lost to evaporation. A 100 MW facility on this architecture consumes on the order of 528,000 gallons a day.
Lawrence Berkeley National Laboratory
Closed-loop liquid, direct-to-chip
Current build standard
Water use effectivenessnear zero in operation
A sealed circuit filled once and recirculated, with heat rejected through dry coolers rather than evaporation. Microsoft states that all of its data centers designed from August 2024 forward use closed-loop architecture, with first deployments in Phoenix and Mount Pleasant, Wisconsin, avoiding more than 125 million liters per year per facility. Oracle's 2026 AI facilities in New Mexico, Michigan, Texas and Wisconsin use the same approach. The Abilene, Texas campus took roughly a one-million-gallon initial fill and then periodic maintenance top-ups.
Microsoft
Air cooling in a suitable climate
Proven
Water use effectivenesssite-dependent, can be negligible
The sharpest available illustration of how much architecture matters: one operator's air-cooled Texas facility used 10,000 gallons across all of 2024, while the same operator's older Iowa facility used 1.3 billion gallons in the same year. Five orders of magnitude, same company, same year.
SAVRN
Dry cooling
Proven
Water use effectivenessover 90% reduction
Rejects heat to air rather than to evaporation. Reduces water consumption by more than 90% against the evaporative baseline, at an energy penalty that rises with ambient temperature. Hybrid systems that switch between modes cut annual evaporative losses by up to 75%.
Information Technology and Innovation Foundation
Reclaimed and recycled municipal water
Policy favorite
Water use effectivenessshifts the source, not the volume
Uses treated wastewater effluent rather than potable supply. It does not reduce the gallons; it removes them from the drinking water system. This is the mechanism Florida's SB 484 requires where feasible, that Virginia's failed SB 417 would have funded, and that three separate federal bills would subsidize with a 30% investment credit.
Florida Senate
Single-phase immersion
Emerging
Water use effectivenessclosed circuit
Roughly 47% of the installed liquid-cooling base. Supports very high rack densities. Deployed mainly in cryptocurrency mining, specialized HPC clusters, edge AI and pilot hyperscale installations.
SAVRN
Two-phase immersion
Supply-constrained
Water use effectivenessclosed circuit
3M discontinued production of the principal fluid in 2025 citing PFAS concerns. Remaining alternatives run $500 to $1,000 per gallon, and NVIDIA has not endorsed the approach for Blackwell-generation GPUs, citing long-term reliability and component warranty. Published as a constraint, not a solution.
SAVRN
Figure 3
Water use effectiveness measures the building only. It excludes the power plant, which consumes roughly twelve times more, so a low score here is necessary and not sufficient. Every projection built on 1.8 prices an architecture the industry is already leaving.
Reported water use effectiveness, liters per kilowatt-hour
Industry average baseline1.8L/kWhLawrence Berkeley National Laboratory and DOE FEMP benchmark.
AWS global fleet0.19L/kWhRoughly one-tenth of the industry baseline.
Google0.20L/kWhAbout nine times better than the baseline.
Meta, recent buildings0.20L/kWhRecent construction only; older estate differs.
Who is publishing
The organizations, and what each one is asking for
Data center water is now an organized field. Advocacy groups, industry associations, research institutes, water utilities and interstate agencies are all publishing on it, and their numbers do not agree. This section lists who is publishing, what their headline water claim is, and what they are asking for. The stance label is descriptive, not a judgment. A claim from an advocacy organization is not wrong because it comes from an advocacy organization, and a claim from industry is not right because it comes with a methodology.
Food & Water Watch
Opposition
The Urgent Case Against Data Centers, March 2026
Headline claim
By 2028 U.S. data centers could use as much as 720 billion gallons of water a year just to cool AI servers, equal to the indoor needs of 18.5 million American households. Water consumed by data centers more than tripled from 2014 to 2023.
Asking for
An immediate moratorium on data centers at federal, state and local levels; a regulatory framework for data centers and for AI; a stop to any preemption of local control; and an end to all federal, state and local subsidies for AI data centers.
The most detailed and most heavily cited case for a halt. It organized the July 2026 letter from more than 100 groups asking Governor Hochul to sign New York's moratorium.
foodandwaterwatch.org
Greenpeace USA
Opposition
Campaign against AI infrastructure buildout, 2025 to 2026
Headline claim
17.4 billion gallons of water were used to cool U.S. data centers, enough to fill more than 26,000 Olympic-sized swimming pools. Greenpeace Germany's 2025 analysis warns AI data center electricity demand could be eleven times higher in 2030 than in 2023 without government intervention.
Asking for
Government intervention on AI energy and water demand, and an end to ratepayer subsidy of the buildout.
Uses the same 17.4 billion gallon LBNL figure that industry cites, which makes it one of the few numbers both sides accept. Ran a billboard truck at NVIDIA's GTC conference in March 2026.
greenpeace.org
Sierra Club
Opposition
Data Centers: Local Government Resources
Headline claim
Maintains a resource hub directing local governments on how to evaluate and condition data center proposals.
Asking for
Local conditions on approval, and signatory to the coalition letter supporting New York's moratorium.
The Sierra Club Atlantic Chapter and the national organization both appear among signatories to the multi-group moratorium letters.
sierraclub.org
Data Center Watch
Research
Q1 2026 report
Headline claim
At least 75 data center projects worth about $130 billion were blocked or delayed nationwide from January through March 2026, the most in any three-month period since tracking began in 2023, and equal to the whole of 2025. Active opposition groups more than doubled to 833 across 49 states. Statewide moratorium proposals were introduced in 14 states in the quarter, and more than 300 state-level data center bills were filed in the first six weeks of 2026.
Asking for
None. Tracks and quantifies opposition rather than advocating.
Water is one of four named concern categories, alongside energy, land use and ratepayer impact. Project-level detail sits behind a paid tier, so the public figures cannot be independently recomputed.
datacenterwatch.org
Brockovich AI Data Center Reporting
Crowdsourced
Community reporting map, launched late May 2026
Headline claim
More than 9,200 community reports across 50 states, 116 active local moratoria counted as of June 2026, and more than $286 billion of investment recorded as blocked by community opposition since 2025.
Asking for
Community reporting, local organizing, and legislative transparency.
Self-reported and unverified by design. A report records that a resident is concerned, not that a facility exists or uses the water attributed to it. Snopes confirmed the project is authentic; individual entries are not audited.
Brockovich AI Data Center Reporting
Information Technology and Innovation Foundation
Industry-aligned
The Data Center Water Problem Is Soluble, July 6, 2026
Headline claim
Direct data center water consumption was 17.4 billion gallons in 2023, less than 1% of total U.S. water consumption, against 211 billion gallons consumed indirectly at power plants, roughly twelve times the direct figure. Indirect intensity varies by generation mix, from about 2.1 gallons per kilowatt-hour in the hydropower-heavy Pacific Northwest to about 0.13 in solar-heavy California.
Asking for
State-led governance rather than federal mandates: mandatory standardized disclosure above 1 MW, watershed-based review with performance standards rather than technology mandates, joint water and energy review, and a federal role limited to funding metrics, procurement and research. Explicitly rejects national water mandates and federal preemption of state water law.
The most complete policy architecture published by any party. Also notes that over 200 state data center bills were introduced in 2025 with more than 40 enacted, and that over $130 billion in projects were delayed or abandoned in Q1 2026.
Information Technology and Innovation Foundation
American Water Works Association
Water utilities
Cooling the Cloud: Water Utilities in a Data Driven World, October 28, 2025
Headline claim
Direct data center water use is approximately 2% of total U.S. water consumption. Utilities are sometimes barred from releasing consumption data because of nondisclosure agreements with operators.
Asking for
Better data and clearer contractual terms between utilities and operators.
The source the Congressional Research Service relies on for the 2% figure. The nondisclosure finding is the evidentiary basis for Georgia SB 421 and the disclosure bills generally.
awwa.org
Congressional Research Service
Nonpartisan agency
Data Centers and Water: Frequently Asked Questions, R49057, July 31, 2026
Headline claim
Public water systems supply an estimated 97% of the water provided to U.S. data centers. Congress has generally deferred to state primacy in intrastate water allocation, so state law largely governs access to freshwater. Federal hooks are Clean Water Act permits for wastewater, stormwater and dredge or fill discharges.
Asking for
None. Written for Members of Congress, not for advocacy.
The single most useful document in this subject and the source of the federal bill inventory in this tracker. Coordinated by Peter Folger and Elena H. Humphreys with five other CRS specialists.
U.S. Congress
Circle of Blue
Journalism and research
Great Lakes States Face a Data Center Governance Gap, 2026
Headline claim
More than 220 data center facilities are still planned across the Great Lakes basin, and the eight Great Lakes states have become one of the country's data center epicenters, while no state in the region can say precisely how much water the facilities take.
Asking for
Closing the measurement gap at state level.
Also published playbooks for residents and legislators, and reporting on the first data center-only utility in the United States.
circleofblue.org
Alliance for the Great Lakes
Regional advocacy
A Finite Resource: Managing the Growing Water Needs, August 2025
Headline claim
Growing demand from data centers and industry could stress Great Lakes water, and the most immediate problem is that no one knows exactly how much water the facilities take.
Asking for
Basin-wide accounting of large industrial withdrawals.
Frames the Great Lakes Compact as governing diversion out of the basin while leaving in-basin industrial demand comparatively lightly tracked.
greatlakes.org
Environmental Law Institute
Legal research
Data Centers and Water Fact Sheet, January 2026
Headline claim
Published a fact sheet on the legal and regulatory frameworks governing data center water.
Asking for
None stated.
Listed because it is a primary legal reference in this field. The document returned an access error to automated retrieval and has not yet been read into this tracker.
eli.org
MultiState
Policy tracking
State Data Center Water Usage Legislation Gains Momentum, March 3, 2026
Headline claim
Tracks state data center water bills across California, Iowa, Michigan, South Carolina, Kansas, Virginia and Georgia, and reports that more than 60 bills addressing data center water use were introduced across 2025 and 2026.
Asking for
None. Commercial legislative tracking.
The most reliable running index of state bill numbers and status, and the backbone of the state layer in this tracker.
MultiState
Susquehanna River Basin Commission
Interstate agency
Data Centers & Water Use regulatory page
Headline claim
Only one hyperscale data center permit had been issued in the basin as of early 2026. Developers increasingly source from existing public water supplies, which avoids a withdrawal approval because the volume already sits under the public supplier's approval.
Asking for
None. Regulates withdrawal and consumptive use across New York, Pennsylvania and Maryland.
One of the few agencies anywhere publishing plainly about the loophole in its own regime.
srbc.gov
Data Center Coalition
Industry association
State policy testimony, 2025 to 2026
Headline claim
Reporting requirements aimed at one industry risk penalizing that industry unfairly relative to other large water users.
Asking for
Against sector-specific water reporting mandates.
Represented in state hearings by Dan Diorio, Vice President for State Policy. The strongest version of this argument is that a water rule keyed to volume rather than to sector would be harder to game and harder to challenge.
E&E News
Operators
What the companies have published
Every large operator has now published a water position, and all four of the biggest have pledged to be water positive by 2030. Water positive is a replenishment accounting claim, not a consumption claim: it means funding projects that return water to watersheds, which may not be the watersheds the facilities draw from. Both figures are given below where published, because a company can be water positive on paper and still be the largest single draw on a specific local system.
MicrosoftPledge Water positive by 2030NASDAQ:MSFT
What the company claims
States it achieved water positivity across operations in FY2025, five years early, replenishing more water than it withdrew globally.
What is measured
Fleet WUE reduced from 2.3 to 0.27 liters per kilowatt-hour across its owned fleet in 2025, a near-90% improvement since the early 2000s. All data centers designed from August 2024 forward use closed-loop cooling, with first deployments in Phoenix and Mount Pleasant, Wisconsin, avoiding more than 125 million liters per year per facility.
esgdive.com
Amazon Web ServicesPledge Water positive by 2030 · Amazon.com, Inc.NASDAQ:AMZN
What the company claims
About 75% of the way to the goal, with more than 50 replenishment projects returning more than 5.8 billion gallons annually.
What is measured
Data centers withdrew 2.5 billion gallons of water in 2025. Fleet WUE of 0.19 liters per kilowatt-hour. Cut water consumption in Northern Virginia, its largest data center region, by 42% in the past year.
trellis.net
GooglePledge Water positive by 2030 · Alphabet Inc.NASDAQ:GOOGL
What the company claims
More than 165 projects underway that will replenish more than 19 billion gallons of water annually by 2030.
What is measured
Fleet WUE of 0.20 liters per kilowatt-hour. One air-cooled Texas facility used 10,000 gallons across all of 2024 while an older Iowa facility used 1.3 billion gallons in the same year. As of 2024, 21% of water used in Google data centers was discharged, with the remainder lost to evaporation or sent to sewer.
Google
MetaPledge Water positive by 2030 · Meta Platforms, Inc.NASDAQ:META
What the company claims
Water positive commitment across operations.
What is measured
Recent buildings report WUE of 0.20 liters per kilowatt-hour. The Newton County, Georgia facility is reported to consume about 500,000 gallons per day, roughly 10% of that county's total water use.
Meta
OraclePledge Closed-loop design standardNYSE:ORCL
What the company claims
New AI data centers in New Mexico, Michigan, Texas and Wisconsin use direct-to-chip closed-loop non-evaporative cooling.
What is measured
The Abilene, Texas campus took roughly a one-million-gallon initial fill followed by periodic maintenance top-ups. Two of eight buildings were operational in early 2026.
SAVRN
xAIPledge Aquifer offset via recycling · Wholly owned by SpaceX since February 2026PRIVATE
What the company claims
The Colossus Water Recycling Facility, an approximately $80 million plant with xAI, the Tennessee Valley Authority and Nucor Steel, would process up to 13 million gallons of wastewater daily and eliminate the need to draw from the Memphis Aquifer, with a stated goal of reducing aquifer strain by 9%.
What is measured
Reported as awaiting permits and funding. The Tennessee Department of Environment and Conservation stated it had not received a permit application for the facility. Recorded as a commitment, not a completed mitigation. Ownership note: SpaceX acquired xAI in an all-stock transaction that closed in February 2026, making it a wholly owned subsidiary. SpaceX is itself privately held, so neither entity carries a public listing.
Local 24 Memphis
Citizen signal
What communities are reporting
Crowdsourced platforms are now the largest single record of local objection to data center development, and they are the reason many of the ordinances above exist. They are also self-reported and unverified by design. Everything in this section is recorded as reported by the platform, with the platform named. None of it is treated as a measured quantity, and none of it is mixed into the ledger above.
Brockovich AI Data Center Reporting
Launched Late May 2026
Reported by the platform
9,200+community reports submitted, spanning 50 states
116active local moratoria counted by the platform as of June 2026
$286B+of investment the platform records as blocked by community opposition since 2025
Just over 3,000 reports by June 2, more than 5,000 by June 10, and 8,200 within weeks of launch. Water use for cooling ranks among the most commonly reported concerns, alongside electricity consumption, noise, strain on local infrastructure and electronic waste. The platform names Florida SB 484 and South Dakota SB 135 among tracked water measures, and logs a Mercer County petition over a proposed facility's projected 110 million gallons per year.
How to read this Self-reported and unverified. A report records that a resident is concerned about a facility, not that the facility exists, is permitted, or uses the water attributed to it. Authenticity of the project itself has been confirmed by Snopes; the individual entries have not been independently audited.
Brockovich AI Data Center ReportingSnopes
“Large data centers can consume up to 5 million gallons of water per day, equivalent to a town of 10,000 to 50,000 people.”
Environmental and Energy Study Institute, widely circulated in coverage of the Brockovich map
This describes the upper bound of a large evaporatively cooled facility, not a typical one. Utility metering in Fairfax and Prince William Counties, Virginia, the densest data center market in the United States, reports average daily use of roughly 18,000 to 38,000 gallons per building with peak days approaching 88,000. The gap between the two figures is roughly two orders of magnitude, and it is entirely explained by cooling architecture and facility scale.
Center for Secure Water, University of Illinois
“A 100 MW data center consumes about as much water per day as 2,600 households.”
International Energy Agency, Energy and AI, April 2025
Direct consumption only, averaged across cooling strategies. The IEA splits total data center water use 60% indirect at power plants and 40% direct, so the combined figure is equivalent to about 6,500 households. This is the cleanest household-scale comparison available because it states its basis.
International Energy Agency
“U.S. data centers consume nearly 450 million gallons of water daily and more than 160 billion gallons annually.”
Circulated in coverage of the Brockovich map
This figure sits far above Lawrence Berkeley National Laboratory's measured 17.4 billion gallons of direct consumption for 2023, and far below the 211 billion gallons LBNL attributes to indirect consumption at power plants. It appears to be a partial blend of the two. When a water number for data centers is quoted without saying whether it is direct or indirect, withdrawal or consumption, it cannot be checked and should not be used.
Lawrence Berkeley National Laboratory
Claim checks
11 circulating claims, checked
Each claim below is stated as its author states it, attributed, and set against
what it can be reconciled with. A check is not a rebuttal. Three of these claims hold exactly,
and one of them comes from the report calling for a national moratorium.
ConflictsConflicts with the federal projection
“By 2028, U.S. data centers could use as many as 720 billion gallons of water a year just to cool AI servers, equal to the indoor needs of 18.5 million households.”
Food & Water Watch, The Urgent Case Against Data Centers, March 2026
Lawrence Berkeley National Laboratory projects annual direct consumption rising to between 38 and 73 billion gallons by 2028. The 720 billion gallon figure is roughly ten times LBNL's high case for direct cooling. It is close in magnitude to a combined direct-plus-indirect total, which would include water consumed at power plants rather than at the servers. Stated as cooling alone, it cannot be reconciled with the federal projection.
Information Technology and Innovation Foundation
ConfirmedConfirmed
“Water consumed by data centers more than tripled from 2014 to 2023.”
Food & Water Watch, March 2026
Lawrence Berkeley National Laboratory reports direct consumption of 5.6 billion gallons in 2014 and approximately 17.4 billion gallons in 2023, a factor of 3.1. The claim holds exactly, and it is drawn from the same federal dataset the industry cites.
Lawrence Berkeley National Laboratory
UnresolvedUnresolved
“Closed-loop systems that 'consume zero water' are clever advertising. It is not uncommon for them to lose 25% of their water volume per month.”
Food & Water Watch, March 2026
This is the sharpest technical dispute in the subject and it is not settled by any source located here. A 25% monthly loss on a one-million-gallon fill would be roughly three million gallons a year, which is a different facility from the one implied by 'filled once and recirculated.' Operators publish fleet WUE figures rather than makeup-water volumes, and makeup water is exactly the quantity that would resolve it. San Angelo's ordinance is the only instrument located that would produce the answer, because it caps the fill and requires a separate meter and written notice of any exceedance.
foodandwaterwatch.org
DependsDepends on the grid
“Electricity generation accounts for around 71% of a data center's water footprint.”
Food & Water Watch, March 2026
Three credible figures exist and they are all defensible because they measure different fleets on different grids. The International Energy Agency splits total data center water 60% indirect and 40% direct. Food & Water Watch says about 71% indirect. Lawrence Berkeley National Laboratory's 17.4 billion direct against 211 billion indirect implies about 92%. The spread is real: indirect intensity runs from about 2.1 gallons per kilowatt-hour in the Pacific Northwest to about 0.13 in California. The share is a property of the grid a facility sits on, not a constant.
International Energy Agency
ConfirmedConfirmed
“A federal report estimated that in 2023, through power generation alone, U.S. data centers indirectly consumed over 200 billion gallons of water.”
Food & Water Watch, March 2026
Matches the 211 billion gallon indirect figure attributed to Lawrence Berkeley National Laboratory. Advocacy and industry sources agree on this number, and it is the largest single quantity in the subject.
Information Technology and Innovation Foundation
DependsDepends on the definition
“Around two-thirds of U.S. data centers built since 2022 are in water-stressed regions.”
Food & Water Watch, March 2026, and a parallel Guardian analysis finding roughly two-thirds of planned facilities in areas that saw drought in the past year
A separate framing puts almost a third of U.S. data centers in areas of high or extremely high water stress, covering parts of Utah, Nevada, Arizona, New Mexico, Colorado and California. The two-thirds and one-third figures are not contradictory: one counts recent drought exposure, the other counts a standing water stress classification. Neither is meaningful without naming which index and which threshold, and most citations of both omit that.
grist.org
DependsUpper bound, not typical
“Large data centers can consume up to 5 million gallons of water per day, equivalent to a town of 10,000 to 50,000 people.”
Environmental and Energy Study Institute, widely circulated in coverage of the Brockovich map
This is the ceiling for a large evaporatively cooled facility, not a typical figure. Utility metering in Fairfax and Prince William Counties, Virginia, the densest data center market in the country, reports average daily use of roughly 18,000 to 38,000 gallons per building with peak days approaching 88,000. The gap is about two orders of magnitude and it is explained by cooling architecture and facility scale.
Center for Secure Water, University of Illinois
ConfirmedSound, and states its basis
“A 100 MW data center consumes about as much water per day as 2,600 households.”
International Energy Agency, Energy and AI, April 2025
Direct consumption only, averaged across cooling strategies. The IEA splits total use 60% indirect and 40% direct, so the combined figure is about 6,500 households. This is the cleanest household-scale comparison available precisely because it says which boundary it is drawing.
International Energy Agency
ConflictsReconciles with neither figure
“U.S. data centers consume nearly 450 million gallons of water daily and more than 160 billion gallons annually.”
Circulated in coverage of the Brockovich map
This sits far above Lawrence Berkeley National Laboratory's measured 17.4 billion gallons of direct consumption for 2023 and far below the 211 billion gallons attributed to indirect consumption. It appears to be a partial blend of the two. A water number quoted without saying whether it is direct or indirect, withdrawal or consumption, cannot be checked and should not be used.
Lawrence Berkeley National Laboratory
DependsThe volume is not the mechanism
“Meta's Newton County, Georgia facility consumes about 500,000 gallons per day, roughly 10% of the county's total water use, and county water rates will rise 33% from 2025 to 2027.”
Reported across national and local coverage of the Newton County case
The reported harm in Newton County is dry residential wells, sediment and damaged appliances, which is a groundwater and construction-impact story rather than a cooling-consumption story. Both can be true at once, and the distinction matters for policy: a closed-loop cooling mandate, the most common remedy in this tracker, would not have prevented what residents reported. The county's projected 2030 water deficit and the rate increase are the durable findings.
pressdemocrat.com
DependsA replenishment claim, not a consumption claim
“Microsoft has achieved water positivity across its data center operations, five years ahead of its 2030 goal.”
Microsoft, FY2025 reporting
Water positive means funding projects that return more water to watersheds than the company withdrew globally. It is an accounting position across a portfolio, and the replenishment need not occur in the basins the facilities draw from. The consumption figure and the replenishment figure are different quantities and both should be read. The measured claim alongside it, fleet WUE falling from 2.3 to 0.27 liters per kilowatt-hour, is the one that describes the facilities.
datacenterdynamics.com
The weekly refresh
20 sources on a schedule
Nobody can hand-check three thousand counties every week. What is maintainable is
a registry of the places that report county and city activity, polled on a schedule, diffed
against the last run, with anything new surfaced as a lead. A lead is not a fact. Nothing
reaches the table above without a primary source establishing what the instrument requires.
Sources that refuse automated requests are not worked around. They run through an
official API where one exists, and onto a dated manual checklist where one does not.
Federal
Congress.gov API, data center water billsNew bills and status changes in the 119th Congress. Federal layer of the tracker. The public congress.gov site refuses automated requests; the official API is the supported path and the key is free from api.data.gov.
WeeklyOfficial API
Congressional Research Service, R49057 revisionsReissues of the federal bill inventory. The compilation this tracker's federal layer is built on. Fetch the PDF and extract Table A-1; the HTML product page refuses automated requests.
MonthlyManual check
USGS Water Data APIsMachine-readable national water data. The denominator layer.
ContinuousPolled
USGS county-level water use compilation (state ledger spine)The 2015 county-level release that every state ledger on this page is built from. Watch for the completed 2020 compilation: USGS has released it in phases and it does not yet cover all categories, so it cannot replace 2015 until it does.
AnnualPolled
USGS Water Use Data for the NationCounty and state withdrawal and consumptive use, compiled on five-year circular cycles.
AnnualPolled
Lawrence Berkeley National Laboratory data center energy and water reportingThe direct and indirect consumption anchors: 17.4B gallons direct, 211B indirect, 38 to 73B projected for 2028. Any revision changes the hero figure and several claim checks.
AnnualManual check
Federal Register, river basin commission actionsSRBC and DRBC docket actions, including data center withdrawal and consumptive use approvals.
WeeklyPolled
Regional
Susquehanna River Basin Commission, data centersData center dockets across NY, PA and MD, plus hearing and commission action dates.
MonthlyPolled
Interstate Commission on the Potomac River BasinBasin-scale demand assessment for MD, VA, WV, PA and DC.
QuarterlyPolled
Alliance for the Great Lakes water use reportingGreat Lakes basin industrial withdrawal analysis across the eight compact states.
QuarterlyManual check
State
MultiState data center policy trackingState bill numbers and status across all fifty states. Backbone of the state layer.
WeeklyPolled
LegiScan API, state bill text and statusFull bill text and status for state measures across all fifty states, machine-readable. The public site refuses automated requests; the API is the supported path.
WeeklyOfficial API
Virginia waterworks monthly sales reportingFrom January 2027, the first routine utility reporting anywhere that breaks out data center water as its own category.
MonthlyPolled
Local
Brockovich AI Data Center ReportingCommunity reports and tracked local measures across 50 states. Leads, not facts. Every lead requires a primary source before it enters the tracker.
WeeklyPolled
Data Center Watch quarterly reportsBlocked and delayed project counts, opposition group counts, and state moratorium proposal counts.
QuarterlyPolled
Food & Water Watch data center campaignCoalition letters, state campaign launches, and the running case for a moratorium.
WeeklyPolled
Sierra Club local government data center resourcesModel conditions and local government guidance as it is published.
MonthlyPolled
Circle of Blue, Great Lakes and water-energy deskReported state and local water governance developments, strongest in the Great Lakes states.
WeeklyPolled
Operator
Hyperscaler sustainability reportingFleet WUE, withdrawal volumes and replenishment claims from Microsoft, AWS, Google and Meta. Per-facility disclosure is the metric to watch for.
AnnualPolled
Greenpeace USA data center campaignCampaign actions and published analysis on AI infrastructure water and energy.
WeeklyPolled
Forward
Six levers that would settle this
01
Report consumption, not withdrawal
Almost every disclosure bill in this tracker asks for the intake figure. Illinois asks for intake and discharge, and the difference between those two numbers is the only one that describes what the facility actually took. A reporting regime built on withdrawal produces a large number that means nothing.
State legislatures drafting disclosure bills
02
Standardize the metric before mandating the report
Water use effectiveness is defined as facility water consumption divided by IT electricity demand, which excludes the indirect consumption that is twelve times larger. H.R. 9372 would have NIST develop the measurement standards. Every state mandate written before that standard exists will collect numbers that cannot be compared across jurisdictions.
NIST, DOE, state agencies
03
Condition approvals on architecture, not on promises
San Angelo requires a closed loop, caps the initial fill at 8 gallons per square foot, requires a separate meter, and requires written notice of any exceedance within five business days. That is an enforceable specification. An ordinance that requires a facility to be water-efficient without defining the term is not.
City councils and county commissions
04
Separate the source question from the volume question
Reclaimed and recycled water does not reduce consumption; it moves the draw off the drinking water system. Both matter, and conflating them lets a facility claim a water reduction it has not made. Florida's statute requires reclaimed water where feasible without defining who determines feasibility.
Permitting authorities
05
Follow the water to the power plant
Indirect consumption is roughly twelve times direct consumption, and it varies enormously by generation mix: about 2.1 gallons per kilowatt-hour in the hydropower-heavy Pacific Northwest against about 0.13 in solar-heavy California. A facility can hold a near-zero WUE and still carry a large water footprint through its power purchase.
State energy offices, utility commissions and water authorities jointly
06
Close the counties with no meter at all
The Texas Water Development Board has stated it cannot track groundwater pumping by data centers in counties without a groundwater conservation district, which covers more than half of Texas counties. Louisiana registers groundwater use only above 50,000 gallons a day. No disclosure statute reaches a withdrawal nobody is required to measure.
State water agencies and groundwater districts
Method
How this file is built
Inclusion
An entry is included when a primary or named secondary source establishes that the
instrument exists and states what it requires. Entries without a source are dropped, not softened.
Federal entries are compiled from Congressional Research Service report R49057,
Data Centers and Water: Frequently Asked Questions, July 31, 2026, current as of July 30, 2026.
Crowdsourced platform counts are recorded as reported by the platform and attributed.
They are never treated as measured quantities and never enter the ledger.
Units
Consumption means water withdrawn and permanently removed from its source. Withdrawal
means water taken, most of which is often returned. Application means irrigation delivered.
Each ledger row carries its basis.
Water use effectiveness is facility water consumption divided by IT electricity demand.
It measures the building only. It does not include the water consumed generating the
electricity, which is roughly twelve times larger.
Refresh
A registry of 20 sources is polled on each source's own cadence.
Content is fingerprinted with markup and volatile page furniture stripped out, so a rotating
session token or a rendered timestamp does not fake a change every week.
A source that changed produces a lead, not an entry. Every lead needs a primary source
establishing what the instrument requires before it reaches the table.
A measure added this week counts as new only when the measure's own date falls in the
current month. Everything else publishes as newly located from an earlier period.
Conflating a backfill with this week's news destroys the changelog the first time
somebody checks a date.
The dataset merges and never replaces. A run that would shrink the measure count below
the recorded floor aborts instead of publishing.
Corrections are published rather than quietly edited. The 49 billion gallon revision at the
top of this page is the reason.