Reference design · not a commissioned facility
Self-powered AI factory campus: reference design
This case translates the SAVRN system into an auditable design brief. Site capacity, equipment selections, permits, contracts, schedules, and performance remain project-specific and conditional.
Decision boundary
The design begins by defining IT load separately from total facility load and by stating whether self-powered means peak capacity, annual energy, or continuous operation. Utility exchange, fuel, emissions, redundancy, maintenance, and black start remain visible.
- Hourly electrical and thermal balance
- Largest-outage and maintenance states
- Closed-loop cooling and whole-site water balance
- Protection, islanding, commissioning, and operating telemetry
Evidence required before an operating claim
A production claim requires executed agreements, approved engineering, equipment records, test results, and operating telemetry. Until those records exist, this remains a reference design.
Editorially reviewed by SAVRN Research · Last reviewed August 15, 2026 · Corrections: [email protected]