A retired biomass power site — a brownfield idle since 2008 — redeveloped into an integrated energy and intelligence campus: its own generation, closed-loop cooling with zero makeup water, an intelligence center, a school, and a covenant with the community that hosts it. Five parts, each built as its own document, each live. This page is the front door to all of them.

Every data-center fight in the country is the same fight: a project asks a community for its grid, its water, and its patience, and offers a ribbon-cutting in return. This strategy inverts all three. The campus generates its own power on a brownfield the Valley wrote off decades ago, consumes no water in its loop, and sells finished work — sovereign compute, energy, and heat — rather than draining shared resources. The margin that integration creates funds the covenant: a school on campus, careers up The Orbital, community compute, and public accountability. Each part below is a standalone document built for its own audience. Together they are one argument.

Four measures from the project's design basis and the region's own published studies — drawn so a reader can feel them.
The Mesquite Lake document: the brownfield site read, the integrated design (generation island, central thermal plant, BTES fields), the one-continuous-system process, the incentive stack, and the execution plan. This is where the energy-platform thesis lives in full.
The IVDC operator console: the full 10-year board model across 14 live views — P&L, capital and returns, CapEx, tax credits, the AI Work Center, Sentinel security, the Training Institute, SAVRN's agent workforce, and the construction and sales schedules. The downloadable board workbook is attached.
The community publication: value creation only — no financials. The waterless-and-on-site-power answer to the questions the Valley is already asking of another proposal, the four commitments, the SAVRN Institute's curriculum, the Compute Commons, the sovereign pledges, and a scorecard for every promise.
The workforce ladder in depth: four orbitals from a Valley high-school classroom to a Valley career — IVC dual enrollment running in twelve high schools today, the Institute's eight certificates with paid placements, IVC's associate pathways and its B.S. in Industrial Automation, and SDSU Imperial Valley. Every rung inside the county.
The community business case and the 22-report regional diligence library — land use, IID grid studies, water, traffic, biological, environmental, geotechnical, and fiber reports preserved with a source manifest and a red/amber/green register of what SAVRN must independently prove. Held internally; shared under NDA as diligence requires.

| Audience | Lead with | Then | Never lead with |
|---|---|---|---|
| County & community | Community Covenant | The Orbital → site document (water/power sections) | Financial returns |
| IID & energy partners | Site & Energy Platform | Operating model (power economics) → export framing | Community promises they can't underwrite |
| IVC · schools · SDSU-IV | The Orbital | Community Covenant (Learning Center, Commons) | The board model |
| Investors & board | Operating Model console | Site document (incentive stack) → covenant as license-to-operate | Unpriced community commitments |
| Sovereign & enterprise customers | Site document (independence: power, water, data) | Operating model (AI Work Center) → covenant (stability) | Construction detail |
The order is the strategy. The community never gets sold; investors never get poetry. Every audience can find every page — nothing here contradicts anything else, because each page draws from the same facts.

APN/survey confirmation, title and easements, air-permit path, IID interconnect study, fuel supply, parcel-specific environmental and traffic studies, IVC working group, CBA drafting.
Generation and thermal plant commissioned, first data-hall phase live, Learning Center opens day one, first public dashboard. Construction window: Sep 2026 → full operations Jan 2028.
Remaining 50 MW IT phases on demonstrated reliability and demand — cohorts, local hiring, and Commons scale with published Phase 1 results.
Export agreements, expansion pad, research partnerships, additional capacity — with audited community benefits as a standing condition of growth.
What the Valley gets, how it's proven, and how this project answers the questions residents are already asking.
Read the community publication →Part 04 · For students & familiesFrom a Valley classroom to a Valley career — four orbitals, every rung inside Imperial County.
Climb The Orbital →