Data Center Land Requirements
Thermal & density standards
ASHRAE · UptimeASHRAE Technical Committee 9.9 thermal guidance for high-density data center computing — defines air-cooling cliff (50-60 kW/rack) and liquid-cooling thresholds that shape footprint and acreage requirements.
Uptime Institute Global Data Center Survey on rack density distribution — confirms approximately 8 kW average typical density and ~1% of operators above 100 kW/rack.
Power tariff & grid data
EIA · LBNLU.S. Energy Information Administration Electric Power Monthly — publicly tracked retail commercial-industrial power tariffs by state and utility, used as the baseline for site-by-site cost modeling.
Lawrence Berkeley National Laboratory ‘Queued Up: 2024 Edition’ — 5-year median U.S. interconnection wait, ~2,600 GW in queue, drives the site-selection emphasis on behind-the-meter generation.