AI Infrastructure Deployment Timeline

3 primary sources 3 categories We publish the receipts
A

Interconnection reform research

RMI

RMI analysis of interconnection reform for AI data centers and generator queues — the canonical industry-policy framing of why interconnection wait times stretch deployment timelines.

RMI — Interconnection reform for AI data centers and generator queues View source
B

Modular & prefab construction

IEEE Spectrum

IEEE Spectrum coverage of modular and prefabricated data center deployment — independent technical reporting on the build-speed advantage of modular pods over stick-built construction.

IEEE Spectrum — Modular Data Center reporting View source
C

Federal queue data

LBNL

LBNL ‘Queued Up: 2024 Edition’ — median 5-year interconnection wait for U.S. projects built in 2023 quantifies the wait-state cost that the sovereign campus model is designed to eliminate.

LBNL — “Queued Up: 2024 Edition” View source
These are the primary sources behind our research. Have a better one, or spot an error? Tell us — we’ll correct it.